• Battery Storage plant
-
• Gas reciprocating engines
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
-
• ... and 1 more unique descriptions
817.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• New Build Battery Storage
(2)
-
• New build battery storage
197.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
(2)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
-
• ... and 1 more unique descriptions
124.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
(3)
89.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
Battery Storage Plant
(2)
63.8 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
A Battery Energy Storage System.
(3)
59.5 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
This is a 99.9MW battery storage facility connected at 132kV.
(2)
43.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1)
-
• BESS project to be installed within a future Greener Grid Park.
(3)
-
• 50MW of BESS to be installed within a future Greener Grid Park.
(2)
38.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• A Battery Energy Storage System
(2)
-
• A gas fuelled generating station.
28.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
-
• Two hour duration battery storage
(2)
-
• Two duration battery storage
28.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
Battery Energy Storage Site
(2)
28.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
27.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Lithium-based battery energy storage system.
(3)
24.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
(2)
-
• The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
23.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
23.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
23.0 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Lithium-based battery energy storage system.
(3)
22.5 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
This is a 49.99MW battery storage facility connected at 33kV.
(3)
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 Hour Battery Storage Plant.
-
• ... and 1 more unique descriptions
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• A Lithium Ion Energy Storage System
(2)
-
• A 49.9 Energy Storage System
21.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
New Build Battery Storage Facility
(3)
21.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-1)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)
(3)
21.2 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
This is a 49.9MW battery storage facility connected at 33kV.
(2)
20.7 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
-
• New build battery storage CMU with CMU ID 22AUC1
-
• New build battery storage CMU with CMU ID 22AUC4
-
• New build battery storage CMU with CMU ID 23AUC1
-
• ... and 1 more unique descriptions
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
20.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
19.6 MW
Active -
2026-27 (T-4),
2025-26 (T-1)
Standalone battery storage system connecting at 33kV to the East Killbride substation
(2)
19.5 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
Standalone battery storage system connecting at 33kV to the Broxburn substation
(2)
19.5 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
-
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
-
• 49.9 MW standalone battery energy storage project.
18.8 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.
(2)
18.4 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
Lithium-based battery energy storage system
(3)
17.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
BATTERY STORAGE PLANT
(3)
16.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 hour battery storage system.
-
• ... and 1 more unique descriptions
16.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• A gas fuelled generating station.
(2)
-
• Battery Energy Storage System
(2)
16.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-4)
(and 1 more)
2h-duration battery system
(2)
15.9 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Battery project on greenfield site
15.5 MW
Active -
2025-26 (T-1)
-
• New build 49.995MW / 99.990 MWh battery energy storage system.
(2)
-
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
14.7 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
-
• Energy Storage Site
-
• New Build 33 MW Battery Energy Storage system
-
• New Build Battery Energy Storage system
14.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.
(2)
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
14.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
Lithium-based battery energy storage system
13.6 MW
Active -
2025-26 (T-1)
A battery energy storage system
12.7 MW
Active -
2025-26 (T-1)
A battery energy storage system
12.7 MW
Active -
2025-26 (T-1)
Battery Storage Plant
12.2 MW
Active -
2025-26 (T-1)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
(3)
12.1 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• CMU ID 22WHI4, a new build battery storage CMU
-
• CMU ID 24WHI1, a new build battery storage CMU
11.1 MW
Active -
2026-27 (T-4),
2025-26 (T-1)
This CMU component represents the BESS system of a co-located (solar and storage) site
(2)
10.7 MW
Active -
2027-28 (T-4),
2025-26 (T-1)