Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

82 unique locations 194 components 0 companies Page 1 of 2
Map View
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
Active - 2025-26 (T-1)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
  • • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
  • • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Buxton Power Limited Storage (Duration 2h)
Active - 2025-26 (T-1), 2024-25 (T-1)
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 components)

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land at Guilsborough Lodge Farm, West Haddon Road, Guilsborough, Northampton, NN6 8QE (1 components)

A standalone 0.949MW Battery Energy Storage System connected directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 components)

A standalone 0.949MW BESS connected directly to the DNO network

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (1 components)

A standalone 2 hour BESS connecting directly onto the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 components)

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW (1 components)

A standalone 0.949MW BESS connected directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land To The North Of Folly Road, Deanshanger, MK19 6EY (1 components)

A 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (1 components)

A 2 hour BESS connected directly to the DNO network

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 components)

A standalone 2 hour BESS connecting directly to the DNO network.

GRIDSOURCE LIMITED Storage (Duration 2h)
0.3 MW
Active - 2025-26 (T-1)
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components)

Battery energy storage unit (6)

FRP MERCIA HOLDCO LIMITED Storage (Duration 2h)
1.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity. (2)

NEVENDON ENERGY STORAGE LTD Storage (Duration 2h)
2.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Smithyard Lane, Watchet, TA4 4NN (1 components)

New Build CMU comprising of battery storage and associated plant

CONRAD (WATCHET) LIMITED Storage (Duration 2h)
3.2 MW
Active - 2025-26 (T-1)
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

LOW CARBON UK SOLAR OPERATIONS LIMITED Storage (Duration 2h)
3.3 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
land at Keelings Road, Southminster, CM0 7JF (4 components)
  • • New build generating CMU component known as Dengie BESS (2)
  • • New build generating CMU component known as Dengie Solar Park (2)
BRITISH SOLAR RENEWABLES LIMITED Solar Photovoltaic Storage (Duration 2h)
3.3 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable … (3)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
ECOTRICITY (SMART GRID) LIMITED Storage (Duration 2h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (BASINGSTOKE) LIMITED Storage (Duration 2h)
5.3 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant
CONRAD (SWINDON) LIMITED Storage (Duration 2h)
6.7 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

LOW CARBON UK SOLAR OPERATIONS LIMITED Storage (Duration 2h)
7.1 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
  • • Existing CMU comprising of battery storage and associated plant (2)
  • • New Build CMU comprising of battery storage and associated plant (2)
CONRAD (WINCHESTER) LIMITED Storage (Duration 2h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
  • • The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (3)
  • • The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, … (2)
FP LUX SCURF DYKE SOLAR LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.3 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
  • • CMU ID 22NEW1, a new build battery storage CMU
  • • CMU ID 22NEW4, a new build battery storage CMU
  • • CMU ID 23NEW1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD NEWPORT LTD Storage (Duration 2h)
8.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Barton Hill Way, Torquay, TQ2 8JG (6 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
Dockside Power Limited Storage (Duration 1h) Storage (Duration 2h)
8.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Blandford Road, Poole, BH16 6AB (4 components)
  • • A 25MW New Build Battery Storage Site (2)
  • • A 25 MW Battery Storage Site
  • • A 25MW Battery Storage Site
EQUINOR BLANDFORD ROAD LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
9.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (BLACKPOOL) LIMITED Storage (Duration 1h) Storage (Duration 2h)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

LOW CARBON UK SOLAR OPERATIONS LIMITED Storage (Duration 2h)
10.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Land at Davies Road, Blackburn, Lancashire BB1 3HR (2 components)
  • • CMU ID 22WHI4, a new build battery storage CMU
  • • CMU ID 24WHI1, a new build battery storage CMU
FIELD WHITEBIRK LTD Storage (Duration 2h)
11.1 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

PULSE CLEAN ENERGY SPV ANNING LIMITED Storage (Duration 2h)
12.1 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 components)

A battery energy storage system

HEIT BF LIMITED Storage (Duration 2h)
12.7 MW
Active - 2025-26 (T-1)
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 components)

A battery energy storage system

HEIT BF LIMITED Storage (Duration 2h)
12.7 MW
Active - 2025-26 (T-1)
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (1 components)

Lithium-based battery energy storage system

COWLEY BALDON GREEN LIMITED Storage (Duration 2h)
13.6 MW
Active - 2025-26 (T-1)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
  • • Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
  • • Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
  • • Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
SG GRI TILN BESS LIMITED Storage (Duration 2h)
14.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
  • • Energy Storage Site
  • • New Build 33 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HEIT WG LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
14.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
  • • New build 49.995MW / 99.990 MWh battery energy storage system. (2)
  • • New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
AGR SOLAR 2 LIMITED Solar Photovoltaic Storage (Duration 2h)
14.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

MANNINGTON ENERGY CENTRE LIMITED Storage (Duration 2h)
15.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

SUNDON GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Showing locations 1 - 50 of 82