Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • ... and 2 more unique descriptions
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
  • • A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (3)
  • • A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield … (2)
GATEWAY ENERGY CENTRE LIMITED Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
30.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 1 more)
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
  • • A Battery Energy Storage System (2)
  • • A gas fuelled generating station.
HD639LEG LIMITED Reciprocating engines Storage (Duration 2h)
28.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
HB411MIN LTD Storage (Duration 2h)
19.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
  • • 49.5 MW Battery Energy Storage facility (3)
  • • 48 MW Battery Energy Storage facility
HARMONY CF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Clay Tye Road, Upminister, RM14 3PL (7 components)
  • • 49.5MW Battery Energy Storage facility connected to 132kv network (4)
  • • 48MW Battery Energy Storage facility connected to 132kv network
HARMONY CTF 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
  • • 49.5MW Battery Energy Storage facility (2)
  • • 48MW Battery Energy Storage facility
  • • 49.9MW Battery Energy Storage facility
HARMONY (PW) 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 1 more)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
  • • A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works … (3)
  • • A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
VATTENFALL WIND POWER LTD Storage Storage (Duration 2h)
7.4 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 3 more)
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
  • • Energy facility comprising of battery energy storage sets and ancillary equipment. (3)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (2)
STOR 108 LTD Reciprocating engines Storage (Duration 2h)
7.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Stonehill, Charlton, Malmesbury, SN16 9RP (1 components)

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

STONEHILL ENERGY STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
  • • A New Build Gas fuelled power plant at Capenhurst substation (3)
  • • A New Build Battery Energy Storage System (2)
HD888CAP LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
  • • A 49.5MW battery energy storage system (3)
  • • A 48MW battery energy storage system
HARMONY (PW) LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
  • • A new build 20MW battery energy storage system (3)
  • • A new build 19MW battery energy storage system
HARMONY FM LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
  • • CMU consisting of multiple reciprocating engines and alternators (3)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
  • • A transmission connected battery storage unit
  • • A transmission connected solar park.
CLEVE HILL SOLAR PARK LIMITED Solar Photovoltaic Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)
  • • A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (4)
  • • A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
SPALDING ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 2 more)
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
  • • A Battery Energy Storage System
  • • A Battery Energy Storage System.
  • • A New Build Gas fuelled power plant
HD777FRY LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD143OCK LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD144WHI LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (3 components)

A Battery Energy Storage System. (3)

SW MANNINGTON LIMITED Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components)

A Battery Energy Storage System (2)

SW MANNINGTON LIMITED Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2022-23 (T-1)
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
  • • A new build 11MW battery storage system (4)
  • • A new build 10MW battery storage system
HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Showing locations 1 - 50 of 50