-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
A Battery Energy Storage System.
(4)
47.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A Battery Energy Storage System.
(3)
-
• A New Build Gas fuelled power plant.
35.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
(3)
-
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
(2)
30.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
-
• A Battery Energy Storage System
(2)
-
• A gas fuelled generating station.
28.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System.
19.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• 49.5MW Battery Energy Storage facility
(3)
-
• 48MW Battery Energy Storage facility
-
• Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• 49.5 MW Battery Energy Storage facility
(3)
-
• 48 MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• 49.5MW Battery Energy Storage facility connected to 132kv network
(4)
-
• 48MW Battery Energy Storage facility connected to 132kv network
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 49.5MW Battery Energy Storage facility
(2)
-
• 48MW Battery Energy Storage facility
-
• 49.9MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build battery energy storage system
17.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
Battery Storage Plant
(5)
9.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
(3)
-
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises …
(2)
7.4 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 3 more)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
49.900MW OF BATTERY ENERGY STORAGE SYSTEMS
Active -
2024-25 (T-4)
-
• A New Build Gas fuelled power plant at Capenhurst substation
(3)
-
• A New Build Battery Energy Storage System
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A 49.5MW battery energy storage system
(3)
-
• A 48MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A new build 20MW battery energy storage system
(3)
-
• A new build 19MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
-
• CMU consisting of multiple reciprocating engines and alternators
(3)
-
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 1 more)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active -
2024-25 (T-4)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A transmission connected battery storage unit
-
• A transmission connected solar park.
Active -
2024-25 (T-4)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
(4)
-
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• A Battery Energy Storage System
-
• A Battery Energy Storage System.
-
• A New Build Gas fuelled power plant
Active -
2025-26 (T-4),
2024-25 (T-4)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
A Battery Energy Storage System.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
A Battery Energy Storage System
(2)
Inactive -
2024-25 (T-4),
2022-23 (T-1)
49.5MW Battery Energy Storage System
Active -
2024-25 (T-4)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active -
2024-25 (T-4)
-
• A new build 11MW battery storage system
(4)
-
• A new build 10MW battery storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
-
• A new build 30MW battery energy storage system
(3)
-
• A new build 29MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)