-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
(2)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
-
• ... and 1 more unique descriptions
124.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
A Battery Energy Storage System.
(3)
59.5 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• BESS project to be installed within a future Greener Grid Park.
(3)
-
• 50MW of BESS to be installed within a future Greener Grid Park.
(2)
38.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
CMU to comprise multiple individual storage units metered and despatched centrally
(3)
34.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Lithium-based battery energy storage system.
(3)
24.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
23.0 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Lithium-based battery energy storage system.
(3)
22.5 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
This is a 49.99MW battery storage facility connected at 33kV.
(3)
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 Hour Battery Storage Plant.
-
• ... and 1 more unique descriptions
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• A Lithium Ion Energy Storage System
(2)
-
• A 49.9 Energy Storage System
21.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)
(3)
21.2 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• New build battery storage CMU with CMU ID 22AUC1
-
• New build battery storage CMU with CMU ID 22AUC4
-
• New build battery storage CMU with CMU ID 23AUC1
-
• ... and 1 more unique descriptions
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
20.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• 49.5MW Battery Energy Storage facility
(3)
-
• 48MW Battery Energy Storage facility
-
• Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• 49.5 MW Battery Energy Storage facility
(3)
-
• 48 MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A 49.9MW battery energy storage system
-
• A battery energy storage system
18.3 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1)
Lithium-based battery energy storage system
(3)
17.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build battery energy storage system
17.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 hour battery storage system.
-
• ... and 1 more unique descriptions
16.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• New build battery storage
(3)
-
• BATTERY STORAGE PLANT
-
• New build generating storage unit
15.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Energy Storage Site
-
• New Build 33 MW Battery Energy Storage system
-
• New Build Battery Energy Storage system
14.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.
(2)
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
-
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
14.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• New build 35MW Battery Energy Storage System
(2)
-
• Lithium-ion Battery Energy Storage System
13.0 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
(3)
12.1 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Brigg Battery 2 hour duration
(3)
9.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• A 25MW New Build Battery Storage Site
(2)
-
• A 25 MW Battery Storage Site
-
• A 25MW Battery Storage Site
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Battery Storage Plant
(5)
9.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
8.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• CMU ID 22NEW1, a new build battery storage CMU
-
• CMU ID 22NEW4, a new build battery storage CMU
-
• CMU ID 23NEW1, a new build battery storage CMU
-
• ... and 1 more unique descriptions
8.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and …
(3)
-
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
(2)
8.3 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
-
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
(3)
-
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises …
(2)
7.4 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 3 more)
-
• Existing CMU comprising of battery storage and associated plant
(2)
-
• New Build CMU comprising of battery storage and associated plant
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
Battery Storage 2 hour duration
(2)
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-1)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.
(2)
6.7 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
6.7 MW
Inactive -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)