-
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
-
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
-
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
New Build CMU comprising of battery storage and associated plant
Active -
2024-25 (T-1)
Battery storage plant
Active -
2024-25 (T-1)
LFP Battery Energy Storage facility
Active -
2024-25 (T-1)
Battery Storage Plant
Active -
2024-25 (T-1)
Battery Storage Plant
Active -
2024-25 (T-1)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.
Active -
2024-25 (T-1)
Battery Storage Plant
Active -
2024-25 (T-1)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 5 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
A new build battery energy storage system
Active -
2024-25 (T-1)
-
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
-
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active -
2025-26 (T-1),
2024-25 (T-1)
-
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
-
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Active -
2025-26 (T-4),
2024-25 (T-1)
A new build 19MW battery energy storage system
(2)
Active -
2025-26 (T-4),
2024-25 (T-1)
12MW 24MWh battery storage located at Brindley Close in Swindon
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• A new build 30MW battery energy storage system
(3)
-
• A new build 29MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A New Build Gas fuelled power plant at Capenhurst substation
(3)
-
• A New Build Battery Energy Storage System
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
New build battery storage.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• A gas fuelled generating station
(2)
-
• A Battery Energy Storage System
Active -
2025-26 (T-4),
2024-25 (T-1)
This is a 20MW battery storage facility connected at 33kV.
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• New-Build Li-Ion BESS, 2hr duration.
-
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
0.6 MW
Active -
2028-29 (T-4),
2024-25 (T-1)
Battery energy storage unit
(6)
1.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• New build generating CMU component - Whaddon Farm BESS
(2)
-
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park.
(2)
2.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
2.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
29.9MW/29.9MWh one hour battery
(2)
3.5 MW
Active -
2026-27 (T-4),
2024-25 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• New build two-hour duration storage to replace diesel plant
(2)
4.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
(2)
-
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
(2)
4.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 1 more)
-
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
(3)
-
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
5.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
(2)
5.2 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
New Build CMU comprising of battery storage and associated plant
(3)
5.3 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
6.7 MW
Inactive -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.
(2)
6.7 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
Battery Storage 2 hour duration
(2)
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-1)
-
• Existing CMU comprising of battery storage and associated plant
(2)
-
• New Build CMU comprising of battery storage and associated plant
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
(3)
-
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises …
(2)
7.4 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 3 more)
-
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and …
(3)
-
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
(2)
8.3 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
-
• CMU ID 22NEW1, a new build battery storage CMU
-
• CMU ID 22NEW4, a new build battery storage CMU
-
• CMU ID 23NEW1, a new build battery storage CMU
-
• ... and 1 more unique descriptions
8.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)