Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

86 unique locations 267 components 0 companies Page 1 of 2
Map View
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
  • • 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
  • • 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
  • • 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Zenobe Wishaw Limited Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 components)

New Build CMU comprising of battery storage and associated plant

CONRAD (ST PHILIPS) LIMITED Storage (Duration 2h)
Active - 2024-25 (T-1)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
Active - 2024-25 (T-1)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (5)

NEVENDON ENERGY STORAGE LTD Storage Storage (Duration 2h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 5 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 components)

A new build battery energy storage system

HEIT BF LIMITED Storage (Duration 2h)
Active - 2024-25 (T-1)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
  • • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
  • • Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Buxton Power Limited Storage (Duration 2h)
Active - 2025-26 (T-1), 2024-25 (T-1)
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
  • • The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
  • • The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
SSE BATTERY SALISBURY LIMITED Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

HARMONY JF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Zenobe Brindley Limited Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD144WHI LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD143OCK LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
  • • A New Build Gas fuelled power plant at Capenhurst substation (3)
  • • A New Build Battery Energy Storage System (2)
HD888CAP LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

UK BATTERY STORAGE LTD Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (4)

HAWKERS HILL ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Link Road, Launceston, Cornwall, PL15 9LP England (2 components)
  • • New-Build Li-Ion BESS, 2hr duration.
  • • Recently-commissioned, existing Li-Ion BESS, 2hr duration.
GRIDBEYOND LIMITED Storage (Duration 2h)
0.6 MW
Active - 2028-29 (T-4), 2024-25 (T-1)
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components)

Battery energy storage unit (6)

FRP MERCIA HOLDCO LIMITED Storage (Duration 2h)
1.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
  • • New build generating CMU component - Whaddon Farm BESS (2)
  • • New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
BRITISH SOLAR RENEWABLES LIMITED Solar Photovoltaic Storage (Duration 2h)
2.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable … (3)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
ECOTRICITY (SMART GRID) LIMITED Storage (Duration 2h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

FLEXION ENERGY HOLDINGS UK LTD Storage (Duration 2h)
5.2 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (BASINGSTOKE) LIMITED Storage (Duration 2h)
5.3 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
  • • Battery storage plant (4)
  • • Existing generating battery storage unit.
ARBROATH LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.1 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant
CONRAD (SWINDON) LIMITED Storage (Duration 2h)
6.7 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Aikengall 2a Wind Farm Innerwick EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation. (2)

AIK2A SUSTAINABLE ENERGY LTD Storage (Duration 2h)
6.7 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
  • • Energy facility comprising of battery energy storage sets and ancillary equipment. (3)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (2)
STOR 108 LTD Reciprocating engines Storage (Duration 2h)
7.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
  • • Existing CMU comprising of battery storage and associated plant (2)
  • • New Build CMU comprising of battery storage and associated plant (2)
CONRAD (WINCHESTER) LIMITED Storage (Duration 2h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
  • • A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works … (3)
  • • A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
VATTENFALL WIND POWER LTD Storage Storage (Duration 2h)
7.4 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 3 more)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
  • • The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (3)
  • • The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, … (2)
FP LUX SCURF DYKE SOLAR LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.3 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
  • • CMU ID 22NEW1, a new build battery storage CMU
  • • CMU ID 22NEW4, a new build battery storage CMU
  • • CMU ID 23NEW1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD NEWPORT LTD Storage (Duration 2h)
8.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (7 components)

Battery Storage Plant (4)

MELKSHAM WEST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

WEST DIDSBURY STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (7 components)

Battery Storage Plant (4)

MELKSHAM EAST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Showing locations 1 - 50 of 86