New Build Battery Storage Facility
(3)
21.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-1)
-
• New build battery storage CMU with CMU ID 22AUC1
-
• New build battery storage CMU with CMU ID 22AUC4
-
• New build battery storage CMU with CMU ID 23AUC1
-
• ... and 1 more unique descriptions
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• 49.5MW Battery Energy Storage facility
(2)
-
• 48MW Battery Energy Storage facility
-
• 49.9MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• A 49.9MW battery energy storage system
-
• A battery energy storage system
18.3 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1)
-
• 49.5MW Battery Energy Storage facility
(3)
-
• 48MW Battery Energy Storage facility
-
• Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• 49.5 MW Battery Energy Storage facility
(3)
-
• 48 MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• 49.5MW Battery Energy Storage facility connected to 132kv network
(4)
-
• 48MW Battery Energy Storage facility connected to 132kv network
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build battery energy storage system
17.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
BATTERY STORAGE PLANT
(3)
16.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-1)
-
• New build battery storage
(3)
-
• BATTERY STORAGE PLANT
-
• New build generating storage unit
15.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• New build 35MW Battery Energy Storage System
(2)
-
• Lithium-ion Battery Energy Storage System
13.0 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh
(2)
10.6 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• A 25MW New Build Battery Storage Site
(2)
-
• A 25 MW Battery Storage Site
-
• A 25MW Battery Storage Site
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Battery Storage Plant
(5)
9.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
8.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• CMU ID 22NEW1, a new build battery storage CMU
-
• CMU ID 22NEW4, a new build battery storage CMU
-
• CMU ID 23NEW1, a new build battery storage CMU
-
• ... and 1 more unique descriptions
8.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and …
(3)
-
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
(2)
8.3 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
-
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
(3)
-
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises …
(2)
7.4 MW
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 3 more)
A new build 20MW battery energy storage system
7.4 MW
Inactive -
2023-24 (T-1)
-
• Existing CMU comprising of battery storage and associated plant
(2)
-
• New Build CMU comprising of battery storage and associated plant
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
(3)
-
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
(2)
7.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
(3)
-
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
5.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX].
(2)
2.4 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
2.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
New Build CMU comprising of battery storage and associated plant
(2)
2.2 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
Battery energy storage unit
(6)
1.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
New Build CMU comprising of battery storage and associated plant
(3)
1.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
-
• A new build 11MW battery storage system
(4)
-
• A new build 10MW battery storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
New build battery storage.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
A Battery Energy Storage System.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
12MW 24MWh battery storage located at Brindley Close in Swindon
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
-
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
-
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Inactive -
2023-24 (T-1)
This is a 20MW battery storage facility connected at 33kV.
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)