Storage (Duration 2h)

30 unique locations 127 components 0 companies Page 1 of 1
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Gas fuelled power plant at Kirkby substation. (2)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
  • • 49.5 MW Battery Energy Storage facility (3)
  • • 48 MW Battery Energy Storage facility
HARMONY CF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Clay Tye Road, Upminister, RM14 3PL (7 components)
  • • 49.5MW Battery Energy Storage facility connected to 132kv network (4)
  • • 48MW Battery Energy Storage facility connected to 132kv network
HARMONY CTF 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
  • • A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works … (3)
  • • A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
VATTENFALL WIND POWER LTD Storage Storage (Duration 2h)
7.4 MW
Inactive - 2024-25 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 3 more)
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
  • • Energy facility comprising of battery energy storage sets and ancillary equipment. (3)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (2)
STOR 108 LTD Reciprocating engines Storage (Duration 2h)
7.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
  • • A new build 11MW battery storage system (4)
  • • A new build 10MW battery storage system
HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
  • • A New Build Gas fuelled power plant at Capenhurst substation (3)
  • • A New Build Battery Energy Storage System (2)
HD888CAP LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
  • • A 49.5MW battery energy storage system (3)
  • • A 48MW battery energy storage system
HARMONY (PW) LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
  • • A new build 20MW battery energy storage system (3)
  • • A new build 19MW battery energy storage system
HARMONY FM LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
  • • CMU consisting of multiple reciprocating engines and alternators (3)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (5)

NEVENDON ENERGY STORAGE LTD Storage Storage (Duration 2h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 5 more)
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
  • • Battery storage unit (2)
  • • New reciprocating gensets in acoustic enclosure (2)
  • • Reciprocating genset in acoustic enclosure
FRP MERCIA HOLDCO 2 LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Showing locations 1 - 30 of 30