Search Map View Statistics Support Us Help Login Register

Storage (Duration 2h)

2 unique locations 3 components 0 companies Page 1 of 1
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
  • • A Battery Energy Storage System (2)
  • • Reciprocating engines of 6 mW.
CORPOWER LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.7 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2020-21 (T-4)