Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
  • • Battery Storage plant
  • • Gas reciprocating engines
  • • Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
  • • ... and 1 more unique descriptions
THURROCK POWER LIMITED Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
817.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
  • • New Build Battery Storage (2)
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 4 LIMITED Storage (Duration 2h)
197.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1)
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

ECCLES ENERGY CENTRE LIMITED Storage (Duration 2h)
148.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Netherton Farm, Keith AB55 5PE (12 components)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
  • • ... and 1 more unique descriptions
ZENOBE BLACKHILLOCK LIMITED Storage (Duration 2h) Storage (Duration 4h)
124.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Plutus Energy LTD Storage (Duration 2h)
107.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • ... and 2 more unique descriptions
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
89.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
86.2 MW
Active - 2027-28 (T-4)
Land south of the Rayleigh Main Substation, SS11 8TZ (1 components)

New build generating battery storage unit

GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h)
83.8 MW
Active - 2028-29 (T-4)
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

PD503HAN LTD Storage (Duration 2h) Storage (Duration 8h)
79.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4)
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

KILMARNOCK ENERGY CENTRE LIMITED Storage (Duration 2h)
71.2 MW
Active - 2028-29 (T-4)
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

KONA ASSET 3 LIMITED Storage (Duration 2h)
70.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
  • • Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
67.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 3 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 6 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE43 Limited Storage (Duration 2h)
61.4 MW
Active - 2027-28 (T-4)
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

KXP IMMINGHAM LIMITED Storage (Duration 2h)
59.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Zenobe Stalybridge Limited Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Somerford Farm, SN16 9RN (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
PD688IRO LTD Storage (Duration 2h) Storage (Duration 8h)
58.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

ADV 005 LIMITED Storage (Duration 2h) Storage (Duration 9.5h)
53.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 components)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

CLEVE HILL SOLAR PARK LIMITED Storage (Duration 2h)
53.2 MW
Active - 2026-27 (T-4)
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
50.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
  • • New build generating battery storage unit.
  • • New build generating storage unit
GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h) Storage (Duration 3h)
48.6 MW
Active - 2028-29 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
  • • 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
  • • 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
ZENOBE KILMARNOCK SOUTH LIMITED Storage (Duration 2h)
47.3 MW
Active - 2026-27 (T-4)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE41 Limited Storage (Duration 2h)
46.0 MW
Active - 2027-28 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Plutus Energy LTD Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

STOR 136 LTD Storage (Duration 2h)
39.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4)