Storage (Duration 2.5h)

5 unique locations 7 components 0 companies Page 1 of 1
Land East and South East of Dunton Hall Kingsbury Road Lea Marston North Warwickshire B76 0DH (1 components)

349.900MW Greenfield new build battery energy storage site

WELBAR ENERGY STORAGE LIMITED Storage (Duration 2.5h)
103.5 MW
Active - 2026-27 (T-4)
Minchens Lane Bramley Tadley RG26 5BJ (4 components)
  • • 99.000MW Battery Energy Storage site (3)
  • • New Build Battery Energy Storage site
BRAMLEY BATTERY STORAGE LIMITED Storage (Duration 3h) Storage (Duration 2.5h)
87.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Showing locations 1 - 5 of 5