Search Map View Statistics Support Us Help Login Register

Storage (Duration 2.5h)

6 unique locations 8 components 0 companies Page 1 of 1
Minchens Lane Bramley Tadley RG26 5BJ (4 components)
  • • 99.000MW Battery Energy Storage site (3)
  • • New Build Battery Energy Storage site
BRAMLEY BATTERY STORAGE LIMITED Storage (Duration 3h) Storage (Duration 2.5h)
87.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Showing locations 1 - 6 of 6