Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

99 unique locations 306 components 0 companies Page 1 of 2
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

WATSON HEAD WIND FARM LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)

1.200MW BESS (3)

LIMEJUMP LTD Storage (Duration 1h)
0.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (3 components)

1.200 MW battery storage (3)

LIMEJUMP LTD Storage (Duration 1h)
0.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)
  • • Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. … (3)
  • • 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
  • • Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection … (3)
  • • 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)
  • • Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is … (3)
  • • 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
  • • Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD (2)
SSE ENERGY SUPPLY LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)
  • • Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)
  • • Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
  • • Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is … (3)
  • • 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)
  • • Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as … (3)
  • • 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 components)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

THE ISLE OF WIGHT ENERGY COMPANY LIMITED Storage (Duration 1h)
0.3 MW
Active - 2026-27 (T-4)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)
  • • Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. … (3)
  • • 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2)
GSES 1 LIMITED Storage (Duration 1h)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (2 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt (2)

GATESHEAD ELECTRIC FORECOURT LTD Storage (Duration 1h)
0.7 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (2 components)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt (2)

STEVENAGE ELECTRIC FORECOURT LTD Storage (Duration 1h)
0.7 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (ST PHILIPS) LIMITED Storage (Duration 1h) Storage (Duration 2h)
1.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (5)

E.ON UK PLC Storage (Duration 1h)
1.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
  • • 6.000MW of storage located at Westoning (4)
  • • 6.000MW of battery storage located at Westoning.
CLAYHILL SOLAR LIMITED DSR Storage (Duration 1h)
1.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
1.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
1.4 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (BASINGSTOKE) LIMITED Storage (Duration 1h)
1.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
1.8 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
1.9 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (4)

BOOM BACUP STORAGE LIMITED Storage (Duration 1h)
2.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project. (2)

BOLSHAN RENEWABLES LIMITED Storage (Duration 1h)
2.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (5)

NORWICH EAST ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (5)

GATWICK ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
  • • A Battery Energy Storage System (2)
  • • Reciprocating engines of 6 mW.
CORPOWER LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.7 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2020-21 (T-4)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 components)

1 x 30MW Lithium-ion battery with duration of 1 hour

SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4)
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 components)

30.000 MW standalone battery energy storage project

SUNDON BATTERY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4)
Near Clayfords Farm Strichen Buchan Aberdeenshire AB43 6RH (1 components)

30.000MW standalone battery energy storage project.

CLAYFORDS ENERGY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4)
Near 10 Granny Barbours Road Nairn IV12 5HX (1 components)

30.000 MW standalone BESS

BLACKPARK ENERGY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4)
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 components)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

CARE POWER (BURWELL 1) LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4)
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
  • • 30.000MW standalone battery energy storage project
  • • 47.000MW standalone battery energy storage project
SANDRIDGE BATTERY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (7 components)
  • • Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection … (3)
  • • 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (2)
GSES 1 LIMITED Storage (Duration 1h)
3.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)
  • • Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity … (3)
  • • 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY (2)
GSES 1 LIMITED Storage Storage (Duration 1h)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)
  • • Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection … (3)
  • • 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (2)
GSES 1 LIMITED Storage Storage (Duration 1h)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
GFV-2 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
4.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (4)

TOLLGATE ENERGY STORAGE LIMITED Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 50 of 99