• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas reciprocating engines as the generating unit.
(2)
-
• Battery Storage Station
-
• Open cycle gas turbine as the generating unit.
68.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Battery Energy Storage Site
(2)
28.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
-
• New build two-hour duration battery storage
(2)
-
• New build one-hour duration storage
26.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 Hour Battery Storage Plant.
-
• ... and 1 more unique descriptions
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Battery Storage Plant
(4)
20.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
CMU comprising of battery storage and associated plant
(7)
17.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 hour battery storage system.
-
• ... and 1 more unique descriptions
16.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
14.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(6)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
10.8 MW
Active -
2027-28 (T-4),
2025-26 (T-4)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
49.9MW Lithium-ion Energy Storage System
(4)
8.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
8.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
(3)
-
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
-
• BATTERY ENERGY STORAGE SYSTEM
8.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
electricity storage site comprising brand new batteries, inverters and associated connection plant
(2)
7.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• New Build CMU comprising of battery storage and associated plant
-
• New Build Generating CMU comprising of battery storage and associated plant.
7.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• New build one-hour duration storage
-
• New build two-hour duration battery storage
6.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing
(2)
5.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Battery Storage Station
(3)
-
• 3 x 2MW gas gen sets
-
• 8 x 2MW gas gen sets at West Road
5.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build 1.5 hour duration battery storage
-
• New build one-hour duration storage
4.7 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
50MW Lithium-ion Energy Storage System
(4)
4.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
(4)
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• New build two-hour duration storage to replace diesel plant
(2)
4.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• New build 1.5 hour duration battery storage
-
• New build one-hour duration storage
4.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection …
(3)
-
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
(2)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity …
(3)
-
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
(2)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection …
(3)
-
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
(2)
3.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
2.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
New build one-hour duration storage to replace diesel plant
(2)
1.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Battery Storage Station
(3)
-
• 3 x 2MW gas gen sets
1.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
10MW of Battery Energy Storage Systems to be built.
(4)
1.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New build one-hour duration storage to replace diesel plant
(2)
1.8 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• 7 MW of Battery Storage located at Grantham.
(3)
-
• Battery Storage located at Grantham.
(2)
1.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)