Storage (Duration 1h)

135 unique locations 423 components 0 companies Page 1 of 3
Yalberton Road, Paignton, TQ4 7QL (1 components)

New Build CMU comprising of battery storage and associated plant

POWER INITIATIVES LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4)
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (4)

Zenobe Capenhurst Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.2 MW of demand reduction
  • • The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.200 MW of demand reduction
  • • The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
  • • 0.250MW Battery Energy Storage System (3)
  • • 0.25MW of Demand Reduction
  • • 5MW of demand reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
  • • 49.900MW/49.900MWh battery storage asset, 1 hour duration (4)
  • • The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
CARE POWER (BURWELL 1) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
  • • 10MW Storage (2)
  • • 20MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (5 components)

1.500MW Battery Energy Storage System (4)

LIMEJUMP LTD Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-1) (and 1 more)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (4)

CARE POWER (NEWTONWOOD) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (4)

CARE POWER (BARNSLEY) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
  • • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
  • • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
Muirhall Energy Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-4), 2022-23 (T-1) (and 1 more)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
  • • 0.500MW Battery Energy Storage System (2)
  • • 0.5MW of demand reduction (2)
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 1 more)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration Battery Storage Plant.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

SUSI EELPOWER FORDTOWN LIMITED Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration battery storage project.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

MALDON BESS LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
  • • 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
P3P Partners LLP Reciprocating engines Storage (Duration 1h)
Active - 2025-26 (T-4)
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

LIMEJUMP LTD Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Gerard Hall Energy Limited Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

LIGHTSOURCE SPV 115 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-1)
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
  • • 1 x 50MW Lithium-ion battery with duration of 1 hour
  • • 1 x 50MW Lithium-ion batteryw with duration of 1 hour
SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2023-24 (T-1)
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

BOLSHAN RENEWABLES LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-1)
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (2 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration (2)

CARE POWER (BERKELEY) LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Muirhall Energy Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
  • • New build one-hour duration storage to replace diesel plant
  • • One Hour Duration Battery Storage Plant
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Capenhurst Lane Cheshire CH66 2NT (1 components)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

AURA POWER BESS LTD Storage (Duration 1h)
Active - 2025-26 (T-4)
Coity Road, Bridgend, CF31 1NN (1 components)

New Build CMU comprising of battery storage and associated plant

POWER INITIATIVES LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4)
Showing locations 1 - 50 of 135