New Build CMU comprising of battery storage and associated plant
Active -
2025-26 (T-4)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 0.250MW Battery Energy Storage System
(3)
-
• 0.25MW of Demand Reduction
-
• 5MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
(4)
-
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
-
• 10MW Storage
(2)
-
• 20MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
1.500MW Battery Energy Storage System
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-1)
(and 1 more)
-
• A gas fuelled generating station
(2)
-
• A Battery Energy Storage System
Active -
2025-26 (T-4),
2024-25 (T-1)
battery storage asset 49.900MW/49.900MWh
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New build battery storage 50.000MW/50.000MWh one hour duration asset
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery storage 40.000MW/40.000MWh one duration battery new build
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
(2)
-
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-4),
2022-23 (T-1)
(and 1 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration Battery Storage Plant.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.99MW Lithium-ion Energy Storage System
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration battery storage project.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
40 MW/40MWh BESS
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
New build one-hour duration storage to replace diesel plant
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active -
2025-26 (T-4)
0.800MW Battery Energy Storage System
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
Battery Storage Station
Active -
2025-26 (T-4)
New Battery Storage Site comprising brand new batteries & inverters
Active -
2025-26 (T-4)
A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
A Battery Energy Storage System
Active -
2025-26 (T-4)
A Battery Energy Storage System
Active -
2025-26 (T-4)
-
• 1 x 50MW Lithium-ion battery with duration of 1 hour
-
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Inactive -
2025-26 (T-4),
2023-24 (T-1)
1hr duration battery storage project.
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
Battery Storage Plant
(2)
Inactive -
2025-26 (T-4),
2021-22 (T-4)
new build battery storage asset 49.900MW/49.900MWh one hour duration
(2)
Active -
2025-26 (T-4),
2024-25 (T-1)
Battery Storage Station
Active -
2025-26 (T-4)
A Battery Energy Storage System
Active -
2025-26 (T-4)
Battery Storage Station
Active -
2025-26 (T-4)
Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-4)
-
• New build one-hour duration storage to replace diesel plant
-
• One Hour Duration Battery Storage Plant
Active -
2025-26 (T-4),
2024-25 (T-1)
Battery Storage Station
Active -
2025-26 (T-4)
A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane
Active -
2025-26 (T-4)
New Build CMU comprising of battery storage and associated plant
Active -
2025-26 (T-4)