Storage (Duration 1h)

32 unique locations 97 components 0 companies Page 1 of 1
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
  • • 35.000MW battery energy storage system
  • • 35.000MW battery energy storage system.
  • • 49.990 MW battery energy storage system at Richborough Energy Park
  • • ... and 2 more unique descriptions
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
14.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
  • • 50MW/50MWh one hour battery (3)
  • • 50MW/50MWh one hour battery storage
CARE POWER (BRENTWOOD) LIMITED Storage (Duration 1h)
12.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (BLACKPOOL) LIMITED Storage (Duration 1h) Storage (Duration 2h)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (4)

FS WEST GOURDIE LIMITED Storage (Duration 1h)
9.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Barton Hill Way, Torquay, TQ2 8JG (6 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
Dockside Power Limited Storage (Duration 1h) Storage (Duration 2h)
8.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
  • • The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (3)
  • • The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, … (2)
FP LUX SCURF DYKE SOLAR LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.3 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
  • • 40MW OF BATTERY ENERGY STORAGE SYSTEMS (3)
  • • 30MW OF BATTERY ENERGY STORAGE SYSTEMS
  • • BATTERY ENERGY STORAGE SYSTEM
FAREHAM ENERGY RESERVE LIMITED Storage (Duration 1h)
8.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD GERRARDS CROSS LTD Storage (Duration 1h)
7.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
  • • 49.990 MW battery energy storage system
  • • Battery Energy Storage System
  • • battery energy storage system
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
6.1 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 components)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

SANDRIDGE BATTERY STORAGE LIMITED Storage (Duration 1h)
6.0 MW
Active - 2025-26 (T-1)
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

BLOXWICH ENERGY STORAGE LIMITED Storage (Duration 1h)
4.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Boscar Grange Farm York YO61 3NQ (5 components)

Battery Energy Storage system operating alongside solar farm (5)

WARRINGTON RENEWABLES (YORK) LTD Storage (Duration 1h)
3.7 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-1) (and 2 more)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
  • • battery storage unit (3)
  • • New build battery storage unit
  • • New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
NURSLING ENERGY TWO LIMITED Storage (Duration 1h)
3.2 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 6 more)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (5)

GATWICK ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (5)

NORWICH EAST ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (4)

BOOM BACUP STORAGE LIMITED Storage (Duration 1h)
2.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. (2)

NORTHWOLD SOLAR FARM LIMITED Storage (Duration 1h)
1.8 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
Voltalia UK Ltd Storage Storage (Duration 1h)
1.4 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 4 more)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (4)

FLEXITRICITY LIMITED Storage (Duration 1h)
1.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Showing locations 1 - 32 of 32