-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(6)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• 49MW Lithium-ion Energy Storage System
(2)
-
• 49.9MW Lithium-ion Energy Storage System
9.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Existing 25 MW storage site using Lithium Ion Batteries
(3)
-
• 25 MW storage site using Lithium Ion Batteries
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A 13MW New Build Battery Storage site
-
• A 6MW New Build CHP site
-
• A New Build Battery Storage site
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-4)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection …
(3)
-
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
(2)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity …
(3)
-
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
(2)
4.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection …
(3)
-
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
(2)
3.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Battery Energy Storage system operating alongside solar farm
(5)
3.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 7 MW of Battery Storage located at Grantham.
(3)
-
• Battery Storage located at Grantham.
(2)
1.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(3)
-
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(2)
1.5 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 15.000MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
-
• Existing Generator Battery Energy Storage System
-
• ... and 1 more unique descriptions
1.4 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 4 more)
-
• 6.000MW of storage located at Westoning
(4)
-
• 6.000MW of battery storage located at Westoning.
1.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
4MW battery co-located with a solar farm
(5)
1.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
-
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. …
(3)
-
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
(2)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as …
(3)
-
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is …
(3)
-
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is …
(3)
-
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection …
(3)
-
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. …
(3)
-
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
12MW Battery Storage located at Brindley Close in Swindon
Active -
2024-25 (T-4)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Active -
2024-25 (T-4)
1x 2.000MW 1 hour Energy Storage System
Active -
2024-25 (T-4)
4 x 2.5MW and 1 x 0.8MW BESS units installed on the site
Active -
2024-25 (T-4)
49.9MW Battery Storage facility located at Capenhurst GSP
Active -
2024-25 (T-4)
49.900 Storage unit
Active -
2024-25 (T-4)
100MW storage unit
Active -
2024-25 (T-4)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Active -
2024-25 (T-4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
-
• Battery Energy storage linked to solar farm
(3)
-
• Solar farm
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)