Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 components)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

FIELD OLDHAM LTD Storage (Duration 1h)
Active - 2024-25 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Maidenhead Road, Windsor, SL4 5GD (8 components)
  • • Battery storage (2)
  • • Battery strorage unit (2)
  • • Battery Storage
CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.2 MW of demand reduction
  • • The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
  • • 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (3)
  • • 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales. (2)
PORTH WEN SOLAR LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.200 MW of demand reduction
  • • The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

GHEB2 A1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 3 more)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
  • • 0.250MW Battery Energy Storage System (3)
  • • 0.25MW of Demand Reduction
  • • 5MW of demand reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (4)

BOLSHAN RENEWABLES LIMITED Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (4)

GHEB2 C1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (5 components)

1.500MW Battery Energy Storage System (4)

LIMEJUMP LTD Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-1) (and 1 more)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
  • • 0.500MW Battery Energy Storage System (2)
  • • 0.5MW of demand reduction (2)
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 1 more)
60-70 Reach Road Burwell CB25 0AH (3 components)
  • • 10MW of onshore wind generation
  • • 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
  • • 49.900MW storage installation
East Anglia Grid Storage One Limited Onshore Wind Solar Photovoltaic Storage (Duration 1h)
Active - 2024-25 (T-4)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

ARL 001 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Shaw-Energi Ltd Storage Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2024-25 (T-4), 2022-23 (T-4), 2021-22 (T-4)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)

Field Gerrards Cross Ltd Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

LIMEJUMP LTD Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Zenobe Wishaw Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 components)

12MW Battery Storage located at Brindley Close in Swindon

Zenobe Brindley Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
Carnegie Road, Liverpool L13 7HY (1 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Shaw-Energi Ltd Storage (Duration 1h)
Active - 2024-25 (T-4)
Forest Lane, Alne, York, YO61 1TU (1 components)

1x 2.000MW 1 hour Energy Storage System

LIMEJUMP LTD Storage (Duration 1h)
Active - 2024-25 (T-4)
Great Wheatley Road Rayleigh SS6 7AR (1 components)

4 x 2.5MW and 1 x 0.8MW BESS units installed on the site

WEIRS DROVE DEVELOPMENT LIMITED Storage (Duration 1h)
Active - 2024-25 (T-4)
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 components)

49.9MW Battery Storage facility located at Capenhurst GSP

Zenobe Capenhurst Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • ... and 1 more unique descriptions
BRK 001 Limited Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (3)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
  • • 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 3 more)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
  • • Battery Energy storage linked to solar farm (3)
  • • Solar farm (2)
WARRINGTON RENEWABLES (HULL) LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)
  • • Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. … (3)
  • • 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)
  • • Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection … (3)
  • • 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
  • • Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD (2)
SSE ENERGY SUPPLY LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)
  • • Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is … (3)
  • • 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
  • • Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is … (3)
  • • 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)
  • • Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as … (3)
  • • 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (5 components)
  • • Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)
  • • Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection … (3)
  • • 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (2)
GSES 1 LIMITED Storage (Duration 1h)
0.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)
  • • Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. … (3)
  • • 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2)
GSES 1 LIMITED Storage (Duration 1h)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Showing locations 1 - 50 of 75