The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Active -
2024-25 (T-4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Battery storage
(2)
-
• Battery strorage unit
(2)
-
• Battery Storage
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• Gas Peaking Reciprocating Engine
(4)
-
• Battery Storage Plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
(3)
-
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 0.250MW Battery Energy Storage System
(3)
-
• 0.25MW of Demand Reduction
-
• 5MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
New build storage facility
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
1.500MW Battery Energy Storage System
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-1)
(and 1 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)
-
• 10MW of onshore wind generation
-
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
-
• 49.900MW storage installation
Active -
2024-25 (T-4)
A Battery Energy Storage System
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
(3)
Inactive -
2024-25 (T-4),
2022-23 (T-4),
2021-22 (T-4)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
A new battery storage plant, with associated civil works, switchgear and electrical connection.
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
0.800MW Battery Energy Storage System
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Active -
2024-25 (T-4)
Battery storage unit
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
12MW Battery Storage located at Brindley Close in Swindon
Active -
2024-25 (T-4)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Active -
2024-25 (T-4)
1x 2.000MW 1 hour Energy Storage System
Active -
2024-25 (T-4)
4 x 2.5MW and 1 x 0.8MW BESS units installed on the site
Active -
2024-25 (T-4)
49.9MW Battery Storage facility located at Capenhurst GSP
Active -
2024-25 (T-4)
49.900 Storage unit
Active -
2024-25 (T-4)
100MW storage unit
Active -
2024-25 (T-4)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
-
• Battery Energy storage linked to solar farm
(3)
-
• Solar farm
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. …
(3)
-
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection …
(3)
-
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is …
(3)
-
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is …
(3)
-
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as …
(3)
-
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection …
(3)
-
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
(2)
0.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. …
(3)
-
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
(2)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)