Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

72 unique locations 264 components 0 companies Page 1 of 2
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (7)

CONRAD (FLITWICK) LIMITED Storage (Duration 1h)
17.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
  • • 35.000MW battery energy storage system
  • • 35.000MW battery energy storage system.
  • • 49.990 MW battery energy storage system at Richborough Energy Park
  • • ... and 2 more unique descriptions
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
14.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
  • • 50MW/50MWh one hour battery (3)
  • • 50MW/50MWh one hour battery storage
CARE POWER (BRENTWOOD) LIMITED Storage (Duration 1h)
12.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (BLACKPOOL) LIMITED Storage (Duration 1h) Storage (Duration 2h)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (4)

FS WEST GOURDIE LIMITED Storage (Duration 1h)
9.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

NEXTPOWER EELPOWER CAMILLA LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
8.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Barton Hill Way, Torquay, TQ2 8JG (6 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
Dockside Power Limited Storage (Duration 1h) Storage (Duration 2h)
8.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (7 components)

Battery Storage Plant (4)

MELKSHAM EAST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

WEST DIDSBURY STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (7 components)

Battery Storage Plant (4)

MELKSHAM WEST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
  • • The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (3)
  • • The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, … (2)
FP LUX SCURF DYKE SOLAR LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.3 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
  • • 40MW OF BATTERY ENERGY STORAGE SYSTEMS (3)
  • • 30MW OF BATTERY ENERGY STORAGE SYSTEMS
  • • BATTERY ENERGY STORAGE SYSTEM
FAREHAM ENERGY RESERVE LIMITED Storage (Duration 1h)
8.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD GERRARDS CROSS LTD Storage (Duration 1h)
7.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
  • • Battery storage plant (4)
  • • Existing generating battery storage unit.
ARBROATH LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.1 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
  • • 49.990 MW battery energy storage system
  • • Battery Energy Storage System
  • • battery energy storage system
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
6.1 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (4)

SUSI EELPOWER HALESWORTH LIMITED Storage (Duration 1h)
4.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

BLOXWICH ENERGY STORAGE LIMITED Storage (Duration 1h)
4.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (4)

TOLLGATE ENERGY STORAGE LIMITED Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
  • • 30.000MW standalone battery energy storage project
  • • 47.000MW standalone battery energy storage project
SANDRIDGE BATTERY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
  • • battery storage unit (3)
  • • New build battery storage unit
  • • New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
NURSLING ENERGY TWO LIMITED Storage (Duration 1h)
3.2 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 6 more)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (5)

GATWICK ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (5)

NORWICH EAST ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (4)

BOOM BACUP STORAGE LIMITED Storage (Duration 1h)
2.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (5 components)

10MW of Battery Energy Storage Systems to be built. (4)

Carrington Power Limited Storage (Duration 1h)
1.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
Voltalia UK Ltd Storage Storage (Duration 1h)
1.4 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 4 more)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (4)

FLEXITRICITY LIMITED Storage (Duration 1h)
1.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

WATSON HEAD WIND FARM LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Showing locations 1 - 50 of 72