Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

72 unique locations 264 components 0 companies Page 1 of 2
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
  • • New build one-hour duration storage to replace diesel plant
  • • One Hour Duration Battery Storage Plant
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

MALDON BESS LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (4)

Zenobe Capenhurst Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration battery storage project.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

SUSI EELPOWER FORDTOWN LIMITED Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration Battery Storage Plant.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (4)

CARE POWER (BARNSLEY) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
  • • 49.900MW/49.900MWh battery storage asset, 1 hour duration (4)
  • • The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
CARE POWER (BURWELL 1) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (4)

CARE POWER (NEWTONWOOD) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
  • • 10MW Storage (2)
  • • 20MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (2 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration (2)

CARE POWER (BERKELEY) LIMITED Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

WATSON HEAD WIND FARM LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (4)

FLEXITRICITY LIMITED Storage (Duration 1h)
1.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
Voltalia UK Ltd Storage Storage (Duration 1h)
1.4 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 4 more)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (5 components)

10MW of Battery Energy Storage Systems to be built. (4)

Carrington Power Limited Storage (Duration 1h)
1.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (4)

BOOM BACUP STORAGE LIMITED Storage (Duration 1h)
2.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (5)

NORWICH EAST ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (5)

GATWICK ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
  • • battery storage unit (3)
  • • New build battery storage unit
  • • New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
NURSLING ENERGY TWO LIMITED Storage (Duration 1h)
3.2 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 6 more)
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (2 components)
  • • 30.000MW standalone battery energy storage project
  • • 47.000MW standalone battery energy storage project
SANDRIDGE BATTERY STORAGE LIMITED Storage (Duration 1h)
3.5 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (4)

TOLLGATE ENERGY STORAGE LIMITED Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

BLOXWICH ENERGY STORAGE LIMITED Storage (Duration 1h)
4.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (4)

SUSI EELPOWER HALESWORTH LIMITED Storage (Duration 1h)
4.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
  • • 49.990 MW battery energy storage system
  • • Battery Energy Storage System
  • • battery energy storage system
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
6.1 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
  • • Battery storage plant (4)
  • • Existing generating battery storage unit.
ARBROATH LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.1 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD GERRARDS CROSS LTD Storage (Duration 1h)
7.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 50 of 72