-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
-
• A gas fuelled generating station
(2)
-
• A Battery Energy Storage System
Active -
2025-26 (T-4),
2024-25 (T-1)
-
• New build one-hour duration storage to replace diesel plant
-
• One Hour Duration Battery Storage Plant
Active -
2025-26 (T-4),
2024-25 (T-1)
New build one-hour duration storage to replace diesel plant
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
40 MW/40MWh BESS
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration battery storage project.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.99MW Lithium-ion Energy Storage System
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration Battery Storage Plant.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery storage 40.000MW/40.000MWh one duration battery new build
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
(4)
-
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
New build battery storage 50.000MW/50.000MWh one hour duration asset
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
battery storage asset 49.900MW/49.900MWh
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• 10MW Storage
(2)
-
• 20MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
new build battery storage asset 49.900MW/49.900MWh one hour duration
(2)
Active -
2025-26 (T-4),
2024-25 (T-1)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Front of the Meter battery storage asset located in Devon.
(4)
1.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• 15.000MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
-
• Existing Generator Battery Energy Storage System
-
• ... and 1 more unique descriptions
1.4 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 4 more)
-
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(3)
-
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(2)
1.5 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
10MW of Battery Energy Storage Systems to be built.
(4)
1.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage
(4)
2.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
2.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
(2)
-
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
2.8 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
(3)
2.8 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• battery storage unit
(3)
-
• New build battery storage unit
-
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
3.2 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 6 more)
29.9MW/29.9MWh one hour battery
(2)
3.5 MW
Active -
2026-27 (T-4),
2024-25 (T-1)
-
• 30.000MW standalone battery energy storage project
-
• 47.000MW standalone battery energy storage project
3.5 MW
Active -
2026-27 (T-4),
2024-25 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• New build two-hour duration storage to replace diesel plant
(2)
4.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
(4)
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.
(3)
4.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
50MW Lithium-ion Energy Storage System
(4)
4.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 49.990 MW battery energy storage system
-
• Battery Energy Storage System
-
• battery energy storage system
6.1 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Existing 25 MW storage site using Lithium Ion Batteries
(3)
-
• 25 MW storage site using Lithium Ion Batteries
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• CMU ID 22GER1, a new build battery storage CMU
-
• CMU ID 22GER4, a new build battery storage CMU
-
• CMU ID 23GER1, a new build battery storage CMU
-
• ... and 1 more unique descriptions
7.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)