-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• A 49MW New Build Battery Storage Site.
(3)
-
• A 34MW New Build Battery Storage Site.
-
• A 49MW existing Battery Storage Site.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• A Battery Energy Storage System
(2)
-
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
(3)
-
• Battery Energy Storage System located at Minety
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
(3)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4)
Battery Energy Storage System
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation
Inactive -
2023-24 (T-4)
-
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
-
• Battery storage and associated infrastructure
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
(3)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• A 20MW New Build Battery Storage site
(2)
-
• A 29.5MW New Build Battery Storage site
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.
Inactive -
2023-24 (T-4)
-
• A new Build Generating Storage CMU
(3)
-
• Existing Generating Storage CMU
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• A 50MW New Build Battery Storage site
(3)
-
• Existing 50MW Battery Storage site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Storage facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
5MW of Lithium Ion battery storage and power conversion systems.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
(3)
-
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 1 more)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
-
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• A 2.5MW New Build Battery Storage System
(2)
-
• A New Build 2.5MW Generation Battery Site
(2)
-
• A New Build Generation Battery Site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
Inactive -
2023-24 (T-4)
A 25MW New Build Battery Storage site
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• A Battery Energy Storage System.
(2)
-
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
(3)
-
• 49.900MW Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• A Battery Energy Storage System
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
-
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Battery storage
(2)
-
• Battery strorage unit
(2)
-
• Battery Storage
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• Gas Peaking Reciprocating Engine
(4)
-
• Battery Storage Plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
(3)
-
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
New build storage facility
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)