Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

67 unique locations 263 components 0 companies Page 1 of 2
Map View
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (4)

CARE POWER (NEWTONWOOD) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration battery storage project.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (2 components)
  • • 1 x 50MW Lithium-ion battery with duration of 1 hour
  • • 1 x 50MW Lithium-ion batteryw with duration of 1 hour
SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2023-24 (T-1)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (4)

CARE POWER (BARNSLEY) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (4)

Zenobe Capenhurst Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
  • • 10MW Storage (2)
  • • 20MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
  • • 49.900MW/49.900MWh battery storage asset, 1 hour duration (4)
  • • The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
CARE POWER (BURWELL 1) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • One-hour duration Battery Storage Plant.
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

GSES 1 LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

SUSI EELPOWER FORDTOWN LIMITED Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (3)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
  • • 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 3 more)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
  • • Battery Energy storage linked to solar farm (3)
  • • Solar farm (2)
WARRINGTON RENEWABLES (HULL) LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

ARL 001 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

MALDON BESS LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (3 components)

1.200 MW battery storage (3)

LIMEJUMP LTD Storage (Duration 1h)
0.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (3 components)

1.200MW BESS (3)

LIMEJUMP LTD Storage (Duration 1h)
0.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2023-24 (T-1)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (2 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt (2)

GATESHEAD ELECTRIC FORECOURT LTD Storage (Duration 1h)
0.7 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (2 components)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt (2)

STEVENAGE ELECTRIC FORECOURT LTD Storage (Duration 1h)
0.7 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (ST PHILIPS) LIMITED Storage (Duration 1h) Storage (Duration 2h)
1.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (BASINGSTOKE) LIMITED Storage (Duration 1h)
1.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (5 components)

10MW of Battery Energy Storage Systems to be built. (4)

Carrington Power Limited Storage (Duration 1h)
1.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (4)

BOOM BACUP STORAGE LIMITED Storage (Duration 1h)
2.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (5)

NORWICH EAST ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (6 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (5)

GATWICK ELECTRIC FORECOURT LTD Storage (Duration 1h)
2.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 2 more)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
  • • battery storage unit (3)
  • • New build battery storage unit
  • • New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
NURSLING ENERGY TWO LIMITED Storage (Duration 1h)
3.2 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 6 more)
Boscar Grange Farm York YO61 3NQ (5 components)

Battery Energy Storage system operating alongside solar farm (5)

WARRINGTON RENEWABLES (YORK) LTD Storage (Duration 1h)
3.7 MW
Inactive - 2025-26 (T-1), 2024-25 (T-4), 2023-24 (T-1) (and 2 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA. (4)

TOLLGATE ENERGY STORAGE LIMITED Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

BLOXWICH ENERGY STORAGE LIMITED Storage (Duration 1h)
4.6 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (4)

SUSI EELPOWER HALESWORTH LIMITED Storage (Duration 1h)
4.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
  • • 49.990 MW battery energy storage system
  • • Battery Energy Storage System
  • • battery energy storage system
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
6.1 MW
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
  • • Battery storage plant (4)
  • • Existing generating battery storage unit.
ARBROATH LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.1 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD GERRARDS CROSS LTD Storage (Duration 1h)
7.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
  • • 40MW OF BATTERY ENERGY STORAGE SYSTEMS (3)
  • • 30MW OF BATTERY ENERGY STORAGE SYSTEMS
  • • BATTERY ENERGY STORAGE SYSTEM
FAREHAM ENERGY RESERVE LIMITED Storage (Duration 1h)
8.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Showing locations 1 - 50 of 67