Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

34 unique locations 145 components 0 companies Page 1 of 1
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

GHEB2 A1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 3 more)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
  • • 0.250MW Battery Energy Storage System (3)
  • • 0.25MW of Demand Reduction
  • • 5MW of demand reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
  • • 49.900MW/49.900MWh battery storage asset, 1 hour duration (4)
  • • The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
CARE POWER (BURWELL 1) LIMITED Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (4)

BOLSHAN RENEWABLES LIMITED Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
  • • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
  • • Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
Muirhall Energy Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-4), 2022-23 (T-1) (and 1 more)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
  • • 0.500MW Battery Energy Storage System (2)
  • • 0.5MW of demand reduction (2)
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 1 more)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Shaw-Energi Ltd Storage Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2024-25 (T-4), 2022-23 (T-4), 2021-22 (T-4)
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Muirhall Energy Limited Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2022-23 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • ... and 1 more unique descriptions
BRK 001 Limited Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (3)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
  • • 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 3 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.2 MW of demand reduction
  • • The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
  • • 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (3)
  • • 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales. (2)
PORTH WEN SOLAR LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.200 MW of demand reduction
  • • The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Showing locations 1 - 34 of 34