Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

32 unique locations 126 components 0 companies Page 1 of 1
Map View
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
  • • A Battery Energy Storage System (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
  • • 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
ARL 001 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)

ENERGY DEMAND & RESPONSE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
  • • A 49MW New Build Battery Storage Site. (3)
  • • A 34MW New Build Battery Storage Site.
  • • A 49MW existing Battery Storage Site.
HC ESS4 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

BRK 002 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
  • • A Battery Energy Storage System (2)
  • • 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
ARL 016 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (7 components)
  • • Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (3)
  • • Battery Energy Storage System located at Minety (2)
MINETY BATTERY STORAGE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity … (3)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
RNA-Energy Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (4)

LIMEJUMP LTD Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

AVE 011 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land off Carseview Road, Forfar, DD8 3BS (7 components)
  • • 3 gas reciprocating engines used for power generation, with associated infrastructure. (3)
  • • Battery storage and associated infrastructure (2)
GAS GENERATION AMY JOHNSON WAY LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
  • • The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export … (3)
  • • The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
RNA-Energy Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
  • • A 20MW New Build Battery Storage site (2)
  • • A 29.5MW New Build Battery Storage site (2)
EQUINOR BLANDFORD ROAD LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (4)

SpectrumReserve2 Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (2)

SpectrumReserve6 Ltd. Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components)

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road (2)

PINSTONE ENERGY CENTRE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
  • • A new Build Generating Storage CMU (3)
  • • Existing Generating Storage CMU
GH ESS7 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

Zenobe Wishaw Limited Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
  • • A 50MW New Build Battery Storage site (3)
  • • Existing 50MW Battery Storage site
HC ESS6 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

IRE 001 LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (2)

HILLHOUSE BATTERY STORAGE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

GRIDRESERVE LTD Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Johnson Street, Leigh, M46 0RB (4 components)

A Battery Energy Storage System (2)

AVE 017 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

RNK Holding Ltd Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems. (2)

HALESFIELD ENERGY CENTER LTD Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
  • • 1 x 50MW Lithium-ion batteryw with duration of 1 hour (3)
  • • 1 x 50MW Lithium-ion battery with duration of 1 hour
SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 1 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
  • • 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
SSE ENERGY SUPPLY LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
  • • A 2.5MW New Build Battery Storage System (2)
  • • A New Build 2.5MW Generation Battery Site (2)
  • • A New Build Generation Battery Site
HC ESS2 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components)

A 25MW New Build Battery Storage site (2)

Noriker Bond Ltd Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Crossways, Greenhithe, DA9 9BB (3 components)
  • • A Battery Energy Storage System. (2)
  • • 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
ARL 002 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (7 components)
  • • 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (3)
  • • 49.900MW Battery Energy Storage System (2)
LOWER MINETY ENERGY LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

BALANCE POWER PROJECTS LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Showing locations 1 - 32 of 32