Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

66 unique locations 295 components 0 companies Page 1 of 2
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)
  • • battery storage unit (3)
  • • New build battery storage unit
  • • New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
NURSLING ENERGY TWO LIMITED Storage (Duration 1h)
3.2 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 6 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
  • • 6.000MW of storage located at Westoning (4)
  • • 6.000MW of battery storage located at Westoning.
CLAYHILL SOLAR LIMITED DSR Storage (Duration 1h)
1.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (5)

E.ON UK PLC Storage (Duration 1h)
1.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

IRE 001 LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (2)

HILLHOUSE BATTERY STORAGE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

GRIDRESERVE LTD Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Johnson Street, Leigh, M46 0RB (4 components)

A Battery Energy Storage System (2)

AVE 017 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

RNK Holding Ltd Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems. (2)

HALESFIELD ENERGY CENTER LTD Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
  • • 1 x 50MW Lithium-ion batteryw with duration of 1 hour (3)
  • • 1 x 50MW Lithium-ion battery with duration of 1 hour
SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 1 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (3 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
  • • 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
SSE ENERGY SUPPLY LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
  • • A 2.5MW New Build Battery Storage System (2)
  • • A New Build 2.5MW Generation Battery Site (2)
  • • A New Build Generation Battery Site
HC ESS2 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components)

A 25MW New Build Battery Storage site (2)

Noriker Bond Ltd Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Crossways, Greenhithe, DA9 9BB (3 components)
  • • A Battery Energy Storage System. (2)
  • • 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
ARL 002 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (7 components)
  • • 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (3)
  • • 49.900MW Battery Energy Storage System (2)
LOWER MINETY ENERGY LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

BALANCE POWER PROJECTS LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • ... and 1 more unique descriptions
BRK 001 Limited Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (3)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
  • • 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 3 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Maidenhead Road, Windsor, SL4 5GD (8 components)
  • • Battery storage (2)
  • • Battery strorage unit (2)
  • • Battery Storage
CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
  • • 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (3)
  • • 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales. (2)
PORTH WEN SOLAR LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

GHEB2 A1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 3 more)
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
  • • A Battery Energy Storage System (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
  • • 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
ARL 001 Limited Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (4)

GHEB2 C1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)

ENERGY DEMAND & RESPONSE LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3)
Showing locations 1 - 50 of 66