-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
CMU comprising of battery storage and associated plant
(7)
17.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
-
• 49MW Lithium-ion Energy Storage System
(2)
-
• 49.9MW Lithium-ion Energy Storage System
9.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
(3)
-
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
-
• BATTERY ENERGY STORAGE SYSTEM
8.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
Battery Energy Storage system operating alongside solar farm
(5)
3.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
-
• battery storage unit
(3)
-
• New build battery storage unit
-
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
3.2 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 6 more)
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
10MW of Battery Energy Storage Systems to be built.
(4)
1.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(3)
-
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(2)
1.5 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 15.000MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
-
• Existing Generator Battery Energy Storage System
-
• ... and 1 more unique descriptions
1.4 MW
Inactive -
2025-26 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 4 more)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
(5)
1.3 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-4)
(and 3 more)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
A Battery Energy Storage System
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
-
• A 49MW New Build Battery Storage Site.
(3)
-
• A 34MW New Build Battery Storage Site.
-
• A 49MW existing Battery Storage Site.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
1hr duration battery storage project.
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
-
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
(3)
-
• Battery Energy Storage System located at Minety
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
-
• A new Build Generating Storage CMU
(3)
-
• Existing Generating Storage CMU
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• A 50MW New Build Battery Storage site
(3)
-
• Existing 50MW Battery Storage site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
-
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
(3)
-
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 1 more)
-
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
(3)
-
• 49.900MW Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
Storage facility
Inactive -
2022-23 (T-1)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
-
• Battery Energy storage linked to solar farm
(3)
-
• Solar farm
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
(4)
-
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
-
• 10MW Storage
(2)
-
• 20MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
1.500MW Battery Energy Storage System
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-1)
(and 1 more)
battery storage asset 49.900MW/49.900MWh
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)