Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 1h)

34 unique locations 78 components 0 companies Page 1 of 1
Map View
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity … (3)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
RNA-Energy Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Land off Carseview Road, Forfar, DD8 3BS (7 components)
  • • 3 gas reciprocating engines used for power generation, with associated infrastructure. (3)
  • • Battery storage and associated infrastructure (2)
GAS GENERATION AMY JOHNSON WAY LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
  • • The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export … (3)
  • • The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of … (2)
RNA-Energy Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (4)

SpectrumReserve2 Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
  • • A new Build Generating Storage CMU (3)
  • • Existing Generating Storage CMU
GH ESS7 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

Zenobe Wishaw Limited Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
  • • A 50MW New Build Battery Storage site (3)
  • • Existing 50MW Battery Storage site
HC ESS6 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

IRE 001 LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

GRIDRESERVE LTD Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

BALANCE POWER PROJECTS LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)

SOUTH WEST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Reliagen Electric Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
  • • The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will …
  • • The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines …
NORTH EAST GRID STORAGE TWO LTD Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (5)

GBSL NURSLING LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

MINETY BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)

Peak Power Connections Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

E.ON UK CHP LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

HILLHOUSE BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

FISHCROSS BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
  • • A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
  • • A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
ENERGY STORE 6 LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

SOUTH EAST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

WEST MELTON BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Ecotricity Generation Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

RNK Holding Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT D LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
  • • 10 MW Storage facility located at Balby, Doncaster. (2)
  • • 10 MW Storage facility
Limejump Virtual 5 Limited Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Breck Road, Wallasey, Liverpool (2 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

ORSTED BURBO (UK) LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
  • • A 49MW New Build Battery Storage Site. (3)
  • • A 34MW New Build Battery Storage Site.
  • • A 49MW existing Battery Storage Site.
HC ESS4 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Milton Court Farm, Dorking, RH4 3LY (6 components)
  • • 6MW battery energy storage facility at Milton Court Farm, Dorking (3)
  • • 5MW battery energy storage facility at Milton Court Farm, Dorking (2)
GBSL DORKING LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Showing locations 1 - 34 of 34