Storage (Duration 1h)

65 unique locations 205 components 0 companies Page 1 of 2
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)
  • • Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection … (3)
  • • 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (2)
GSES 1 LIMITED Storage Storage (Duration 1h)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)
  • • Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity … (3)
  • • 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY (2)
GSES 1 LIMITED Storage Storage (Duration 1h)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
Voltalia UK Ltd Storage Storage (Duration 1h)
1.4 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 4 more)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (5 components)

Battery Storage (5)

WATSON HEAD WIND FARM LIMITED Storage (Duration 1h)
0.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 2 more)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

E.ON UK CHP LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

HILLHOUSE BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

FISHCROSS BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
  • • A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
  • • A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
ENERGY STORE 6 LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

SOUTH EAST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

WEST MELTON BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Ecotricity Generation Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

RNK Holding Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT D LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
  • • 10 MW Storage facility located at Balby, Doncaster. (2)
  • • 10 MW Storage facility
Limejump Virtual 5 Limited Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Breck Road, Wallasey, Liverpool (2 components)

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

ORSTED BURBO (UK) LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.2 MW of demand reduction
  • • The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.200 MW of demand reduction
  • • The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

GHEB2 A1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 3 more)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (4)

BOLSHAN RENEWABLES LIMITED Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (4)

GHEB2 C1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Shaw-Energi Ltd Storage Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2024-25 (T-4), 2022-23 (T-4), 2021-22 (T-4)
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
  • • A 49MW New Build Battery Storage Site. (3)
  • • A 34MW New Build Battery Storage Site.
  • • A 49MW existing Battery Storage Site.
HC ESS4 LIMITED Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 3 more)
Milton Court Farm, Dorking, RH4 3LY (6 components)
  • • 6MW battery energy storage facility at Milton Court Farm, Dorking (3)
  • • 5MW battery energy storage facility at Milton Court Farm, Dorking (2)
GBSL DORKING LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity … (3)
  • • The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 … (2)
RNA-Energy Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
Showing locations 1 - 50 of 65