-
• 6MW battery energy storage facility at Milton Court Farm, Dorking
(3)
-
• 5MW battery energy storage facility at Milton Court Farm, Dorking
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2019-20 (T-1)
(and 2 more)
The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.
(2)
Inactive -
2021-22 (T-4),
2019-20 (T-1)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• Gas Peaking Reciprocating Engine
(4)
-
• Battery Storage Plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
New build storage facility
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
(3)
Inactive -
2024-25 (T-4),
2022-23 (T-4),
2021-22 (T-4)
Battery Storage Plant
(2)
Inactive -
2025-26 (T-4),
2021-22 (T-4)
-
• A 49MW New Build Battery Storage Site.
(3)
-
• A 34MW New Build Battery Storage Site.
-
• A 49MW existing Battery Storage Site.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
(3)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
-
• Battery storage and associated infrastructure
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
(3)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• A new Build Generating Storage CMU
(3)
-
• Existing Generating Storage CMU
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• A 50MW New Build Battery Storage site
(3)
-
• Existing 50MW Battery Storage site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
Storage facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will …
-
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines …
Inactive -
2022-23 (T-4),
2021-22 (T-4)
10MW battery energy storage facility at Upton Lane, Rownhams
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
A new power plant, with associated civil works, switchgear and electrical connection.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
(2)
-
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
2MW BESS
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-1)
(and 2 more)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 10 MW Storage facility located at Balby, Doncaster.
(2)
-
• 10 MW Storage facility
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
44MW Storage consisting of 11 x 4MW units
Inactive -
2021-22 (T-4)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage
(5)
0.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)