Storage (Duration 1h)

9 unique locations 14 components 0 companies Page 1 of 1
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
  • • A Battery Energy Storage System (2)
  • • Reciprocating engines of 6 mW.
CORPOWER LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.7 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2020-21 (T-4)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Milton Court Farm, Dorking, RH4 3LY (6 components)
  • • 6MW battery energy storage facility at Milton Court Farm, Dorking (3)
  • • 5MW battery energy storage facility at Milton Court Farm, Dorking (2)
GBSL DORKING LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (5)

GBSL NURSLING LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

SIGBAT F LIMITED Storage (Duration 1h)
Inactive - 2020-21 (T-4), 2019-20 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT A LIMITED Storage Storage (Duration 1h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)