Storage (Duration 1h)

4 unique locations 7 components 0 companies Page 1 of 1
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
  • • A Battery Energy Storage System (2)
  • • Reciprocating engines of 6 mW.
CORPOWER LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.7 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2020-21 (T-4)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Showing locations 1 - 4 of 4