Storage (Duration 1h)

17 unique locations 28 components 0 companies Page 1 of 1
Map View
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (4)

SpectrumReserve2 Ltd Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

Zenobe Wishaw Limited Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

GRIDRESERVE LTD Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (5)

GBSL NURSLING LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

MINETY BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

HILLHOUSE BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

FISHCROSS BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

WEST MELTON BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Ecotricity Generation Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT D LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
  • • 10 MW Storage facility located at Balby, Doncaster. (2)
  • • 10 MW Storage facility
Limejump Virtual 5 Limited Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT A LIMITED Storage Storage (Duration 1h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Milton Court Farm, Dorking, RH4 3LY (6 components)
  • • 6MW battery energy storage facility at Milton Court Farm, Dorking (3)
  • • 5MW battery energy storage facility at Milton Court Farm, Dorking (2)
GBSL DORKING LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Showing locations 1 - 17 of 17