Storage (Duration 1h)

299 unique locations 827 components 0 companies Page 1 of 6
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Ipswich Road, Cardiff, CF23 9AQ (10 components)
  • • New build two-hour duration battery storage (2)
  • • New build one-hour duration storage
GFV-1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
26.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant (4)

GRENDON LAKES STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
20.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (9 components)

CMU comprising of battery storage and associated plant (7)

CONRAD (FLITWICK) LIMITED Storage (Duration 1h)
17.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
  • • 2 hr duration Battery Energy Storage System located in England
  • • Energy Storage Facility
CHAPEL LANE ENERGY STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
14.6 MW
Active - 2028-29 (T-4), 2026-27 (T-4)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
  • • 35.000MW battery energy storage system
  • • 35.000MW battery energy storage system.
  • • 49.990 MW battery energy storage system at Richborough Energy Park
  • • ... and 2 more unique descriptions
RICHBOROUGH ENERGY PARK LIMITED Storage (Duration 1h)
14.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h)
14.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
  • • 50MW/50MWh one hour battery (3)
  • • 50MW/50MWh one hour battery storage
CARE POWER (BRENTWOOD) LIMITED Storage (Duration 1h)
12.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h)
10.8 MW
Active - 2027-28 (T-4), 2025-26 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (BLACKPOOL) LIMITED Storage (Duration 1h) Storage (Duration 2h)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (4 components)
  • • 49MW Lithium-ion Energy Storage System (2)
  • • 49.9MW Lithium-ion Energy Storage System
SUSI EELPOWER DUNSINANE LIMITED Storage (Duration 1h)
9.3 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (4)

FS WEST GOURDIE LIMITED Storage (Duration 1h)
9.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

NEXTPOWER EELPOWER CAMILLA LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
8.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Blacklaw Windfarm, North Lanarkshire, ML2 9PJ (1 components)

1 x 75MW Lithium-ion battery with duration of 1 hour

SCOTTISHPOWER RENEWABLES (UK) LIMITED Storage (Duration 1h)
8.9 MW
Active - 2026-27 (T-4)
Barton Hill Way, Torquay, TQ2 8JG (6 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
Dockside Power Limited Storage (Duration 1h) Storage (Duration 2h)
8.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

WEST DIDSBURY STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (7 components)

Battery Storage Plant (4)

MELKSHAM EAST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (7 components)

Battery Storage Plant (4)

MELKSHAM WEST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
  • • The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (3)
  • • The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, … (2)
FP LUX SCURF DYKE SOLAR LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.3 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 2 more)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
  • • 40MW OF BATTERY ENERGY STORAGE SYSTEMS (3)
  • • 30MW OF BATTERY ENERGY STORAGE SYSTEMS
  • • BATTERY ENERGY STORAGE SYSTEM
FAREHAM ENERGY RESERVE LIMITED Storage (Duration 1h)
8.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
FIELD GERRARDS CROSS LTD Storage (Duration 1h)
7.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
  • • A 13MW New Build Battery Storage site
  • • A 6MW New Build CHP site
  • • A New Build Battery Storage site
NORIKER PERSEVERANCE LTD Storage (Duration 1h) Combined Heat and Power (CHP)
7.1 MW
Active - 2026-27 (T-4), 2024-25 (T-4)
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

LEAFIELD ENERGY LIMITED Storage (Duration 1h) Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
The Common, Malmesbury, SN16 9RJ (2 components)
  • • New Build CMU comprising of battery storage and associated plant
  • • New Build Generating CMU comprising of battery storage and associated plant.
CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 1h) Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (4)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
  • • CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
  • • CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
DRIFFIELD SOLAR AND STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
  • • New build one-hour duration storage
  • • New build two-hour duration battery storage
GFV-4 LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
  • • Battery storage plant (4)
  • • Existing generating battery storage unit.
ARBROATH LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.1 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Showing locations 1 - 50 of 299