Storage (Duration 1.5h)

106 unique locations 149 components 0 companies Page 1 of 3
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System (2)

ARENKO CLEANTECH LIMITED Storage Storage (Duration 1.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (2 components)

Battery Energy Storage System (2)

ARENKO CLEANTECH LIMITED Storage Storage (Duration 1.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1)
Worset Lane Hartlepool TS27 3BL (1 components)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

WORCESTERSHIRE SOLAR 1 LIMITED Storage (Duration 1.5h)
Active - 2025-26 (T-4)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
  • • A 49.5MW battery energy storage system (3)
  • • A 48MW battery energy storage system
HARMONY (PW) LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
  • • A new build 20MW battery energy storage system (3)
  • • A new build 19MW battery energy storage system
HARMONY FM LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 components)

New 49.5MW Battery Energy Storage system

HARMONY BF2 LIMITED Storage (Duration 1.5h)
Active - 2025-26 (T-4)
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

HARMONY JF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
  • • A new build 11MW battery storage system (4)
  • • A new build 10MW battery storage system
HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

UK BATTERY STORAGE LTD Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (4)

HAWKERS HILL ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW (1 components)

Battery Storage system to be installed at Langage Solar Park

LANGAGE SOLAR PARK LIMITED Storage (Duration 1.5h)
0.6 MW
Active - 2027-28 (T-4)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
GFV-2 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
4.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Draycott Cross Road, Cheadle, ST10 1PN (1 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED Storage (Duration 1.5h)
4.6 MW
Active - 2027-28 (T-4)
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
GFV-3 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
4.7 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA (1 components)

Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping

ICT BATTERY STORAGE LIMITED Storage (Duration 1.5h)
4.8 MW
Active - 2027-28 (T-4)
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 components)

A 47.500 MW / 71.250 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
5.5 MW
Active - 2027-28 (T-4)
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED Storage (Duration 1.5h)
5.7 MW
Active - 2027-28 (T-4)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 components)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

DARLINGTON SOLAR 1 LIMITED Storage (Duration 1.5h)
6.7 MW
Active - 2026-27 (T-4)
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 components)

New build battery storage facility.

DBS 1 LIMITED Storage (Duration 1.5h)
7.1 MW
Active - 2026-27 (T-4)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

FPC ELECTRIC LAND LIMITED Storage (Duration 1.5h)
7.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
  • • The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
  • • The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
RG STEVENAGE BESS LTD Storage (Duration 1.5h)
7.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

HARMONY LS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
  • • New Build 25 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HARMONY HS (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Showing locations 1 - 50 of 106