Search Map View Statistics Support Us Help Login Register

Storage (Duration 1.5h)

21 unique locations 31 components 0 companies Page 1 of 1
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
  • • An 87.500 MW Battery Storage Site Component.
  • • An 87.500 MW New Build Battery Storage Site Component
  • • An 87.500 MW New Build Battery Storage Site Component.
KILMARNOCK FLEXPOWER LTD Storage (Duration 1.5h)
55.2 MW
Active - 2028-29 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
  • • A 110.000 MW / 165.000 MWh battery energy storage system
  • • A 120.000 MW / 180.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
31.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 components)

New Build Battery Energy Storage System

SHEAF ENERGY LIMITED Storage (Duration 1.5h)
27.4 MW
Active - 2028-29 (T-4)
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

WALPOLE GREEN LIMITED Storage (Duration 1.5h)
27.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.9MW Battery Energy Storage system
HARMONY HB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 6 LTD Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

BRAMLEY SOLAR LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

ROTHIENORMAN FLEXPOWER LTD Storage (Duration 1.5h)
13.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
  • • A 46.000 MW / 69.00 MWh battery energy storage system
  • • A 47.500 MW / 71.250 MWh battery energy storage system
FLEET GREEN LIMITED Storage (Duration 1.5h)
12.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 19 LTD Storage (Duration 2h) Storage (Duration 1.5h)
9.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 components)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

COVENTRY ENERGY STORAGE LIMITED Storage (Duration 1.5h)
7.9 MW
Active - 2028-29 (T-4)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Showing locations 1 - 21 of 21