Storage (Duration 1.5h)

41 unique locations 61 components 0 companies Page 1 of 1
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
  • • 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
  • • 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
CARLTON ENERGY NO: 1 LIMITED Storage (Duration 1.5h)
114.0 MW
Active - 2027-28 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Craigie, South Ayrshire, Scotland, KA1 5JT (2 components)

A 175MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD Storage (Duration 1.5h)
40.3 MW
Active - 2027-28 (T-4)
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
  • • A 110.000 MW / 165.000 MWh battery energy storage system
  • • A 120.000 MW / 180.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
31.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
  • • New Build 99.9 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
KEADBY GENERATION LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
  • • 25MW Lithium-ion Energy Storage System
  • • 99.9MW Lithium-ion Energy Storage System
WALPOLE GREEN LIMITED Storage (Duration 1.5h)
28.8 MW
Active - 2027-28 (T-4)
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

WALPOLE GREEN LIMITED Storage (Duration 1.5h)
27.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.9MW Battery Energy Storage system
HARMONY HB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

SAMBAR POWER LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
  • • A New Build Distribution Connected Battery Energy Storage System.
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE POWER PROJECTS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

MELKSHAM CALNE GREEN LIMITED Storage (Duration 9h) Storage (Duration 1.5h)
16.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 6 LTD Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

BRAMLEY SOLAR LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

ROTHIENORMAN FLEXPOWER LTD Storage (Duration 1.5h)
13.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
  • • A 46.000 MW / 69.00 MWh battery energy storage system
  • • A 47.500 MW / 71.250 MWh battery energy storage system
FLEET GREEN LIMITED Storage (Duration 1.5h)
12.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 19 LTD Storage (Duration 2h) Storage (Duration 1.5h)
9.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

HARMONY LS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
  • • New Build 25 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HARMONY HS (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

FPC ELECTRIC LAND LIMITED Storage (Duration 1.5h)
7.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED Storage (Duration 1.5h)
5.7 MW
Active - 2027-28 (T-4)
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 components)

A 47.500 MW / 71.250 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
5.5 MW
Active - 2027-28 (T-4)
Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA (1 components)

Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping

ICT BATTERY STORAGE LIMITED Storage (Duration 1.5h)
4.8 MW
Active - 2027-28 (T-4)
Draycott Cross Road, Cheadle, ST10 1PN (1 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED Storage (Duration 1.5h)
4.6 MW
Active - 2027-28 (T-4)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW (1 components)

Battery Storage system to be installed at Langage Solar Park

LANGAGE SOLAR PARK LIMITED Storage (Duration 1.5h)
0.6 MW
Active - 2027-28 (T-4)
Showing locations 1 - 41 of 41