Search Map View Statistics Support Us Help Login Register

Storage (Duration 1.5h)

44 unique locations 66 components 0 companies Page 1 of 1
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Plutus Energy LTD Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
  • • New Build 99.9 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
KEADBY GENERATION LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
24.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.9MW Battery Energy Storage system
HARMONY HB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

WARLEY GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

ROARING HILL ENERGY STORAGE LTD Storage (Duration 2h) Storage (Duration 1.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
  • • A Lithium Ion Energy Storage System (2)
  • • A 49.9 Energy Storage System
HEIT HP LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.7 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

SWANGATE ENERGY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-1)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

SUNDON GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
  • • A New Build Distribution Connected Battery Energy Storage System.
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE POWER PROJECTS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

MELKSHAM CALNE GREEN LIMITED Storage (Duration 9h) Storage (Duration 1.5h)
16.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
  • • Energy Storage Site
  • • New Build 33 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HEIT WG LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
14.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

ECOSTOR 1 IMMINGHAM LTD Storage (Duration 1.5h)
14.2 MW
Active - 2026-27 (T-4)
Blandford Road, Poole, BH16 6AB (4 components)
  • • A 25MW New Build Battery Storage Site (2)
  • • A 25 MW Battery Storage Site
  • • A 25MW Battery Storage Site
EQUINOR BLANDFORD ROAD LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
9.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
LAND SOUTH WEST OF COWLEY SUBSTATION, NUNEHAM COURTENAY, OXFORD, OX44 9PA (1 components)

Lithium-based battery energy storage system.

COWLEY BALDON GREEN LIMITED Storage (Duration 1.5h)
8.9 MW
Active - 2026-27 (T-4)
Land to the east of the Channel, Burstall, Suffolk, IP8 4JL (1 components)

Lithium-based battery energy storage system.

BRAMFORD GREEN LIMITED Storage (Duration 1.5h)
8.9 MW
Active - 2026-27 (T-4)
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 components)

Lithium-based battery energy storage system.

ENSO GREEN HOLDINGS K LIMITED Storage (Duration 1.5h)
8.9 MW
Active - 2026-27 (T-4)
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

NEXTPOWER EELPOWER CAMILLA LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
8.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
  • • New Build 25 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HARMONY HS (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

HARMONY LS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
  • • The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
  • • The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export …
RG STEVENAGE BESS LTD Storage (Duration 1.5h)
7.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours (2)

FPC ELECTRIC LAND LIMITED Storage (Duration 1.5h)
7.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 components)

New build battery storage facility.

DBS 1 LIMITED Storage (Duration 1.5h)
7.1 MW
Active - 2026-27 (T-4)
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 components)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

DARLINGTON SOLAR 1 LIMITED Storage (Duration 1.5h)
6.7 MW
Active - 2026-27 (T-4)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
GFV-3 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
4.7 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
  • • New build 1.5 hour duration battery storage
  • • New build one-hour duration storage
GFV-2 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
4.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Showing locations 1 - 44 of 44