Search Map View Statistics Support Us Help Login Register

Storage (Duration 1.5h)

18 unique locations 26 components 0 companies Page 1 of 1
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Plutus Energy LTD Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
24.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

WARLEY GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

ROARING HILL ENERGY STORAGE LTD Storage (Duration 2h) Storage (Duration 1.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
  • • A Lithium Ion Energy Storage System (2)
  • • A 49.9 Energy Storage System
HEIT HP LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.7 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

SWANGATE ENERGY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-1)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

SAMBAR POWER LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

SUNDON GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
  • • Energy Storage Site
  • • New Build 33 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HEIT WG LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
14.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Blandford Road, Poole, BH16 6AB (4 components)
  • • A 25MW New Build Battery Storage Site (2)
  • • A 25 MW Battery Storage Site
  • • A 25MW Battery Storage Site
EQUINOR BLANDFORD ROAD LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
9.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Land at West Road, Trafford Park, M41 7SW (7 components)
  • • Battery Storage Station (3)
  • • 3 x 2MW gas gen sets
  • • 8 x 2MW gas gen sets at West Road
ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Showing locations 1 - 18 of 18