Search Map View Statistics Support Us Help Login Register

Storage (Duration 1.5h)

27 unique locations 44 components 0 companies Page 1 of 1
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
24.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

WARLEY GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

ROARING HILL ENERGY STORAGE LTD Storage (Duration 2h) Storage (Duration 1.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
  • • A Lithium Ion Energy Storage System (2)
  • • A 49.9 Energy Storage System
HEIT HP LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.7 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
  • • 49.5 MW Battery Energy Storage facility (3)
  • • 48 MW Battery Energy Storage facility
HARMONY CF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

SUNDON GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
  • • Energy Storage Site
  • • New Build 33 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HEIT WG LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
14.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Rusholme Grange, Drax, YO8 8PW (4 components)
  • • New build 35MW Battery Energy Storage System (2)
  • • Lithium-ion Battery Energy Storage System
HARMONY RH LTD Storage (Duration 2h) Storage (Duration 1.5h)
13.0 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Blandford Road, Poole, BH16 6AB (4 components)
  • • A 25MW New Build Battery Storage Site (2)
  • • A 25 MW Battery Storage Site
  • • A 25MW Battery Storage Site
EQUINOR BLANDFORD ROAD LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
9.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (4)

NEXTPOWER EELPOWER CAMILLA LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
8.9 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
  • • This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
  • • This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
CAPBAL (FORFAR) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (3)

CAPBAL (BRACO) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
2.8 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
  • • A 40MW New Build Battery Storage site (3)
  • • A 45MWh New Build Battery Storage site
STAIRFOOT GENERATION LTD Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (4)

HAWKERS HILL ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

HARMONY JF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

UK BATTERY STORAGE LTD Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 27 of 27