Storage (Duration 1.5h)

6 unique locations 13 components 0 companies Page 1 of 1
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
  • • A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
  • • ... and 2 more unique descriptions
EQUINOR WELKIN MILL LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Showing locations 1 - 6 of 6