Storage (Duration 1.5h)

3 unique locations 10 components 0 companies Page 1 of 1
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (10 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (5)

Portman Power Limited Storage (Duration 1h) Storage (Duration 1.5h)
6.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
  • • A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (3)
  • • A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
THRIVE RENEWABLES (WICKEN) LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
1.5 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Showing locations 1 - 3 of 3