Search Map View Statistics Support Us Help Login Register

Storage (Duration 1.5h)

106 unique locations 149 components 0 companies Page 1 of 3
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
  • • 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
  • • 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
CARLTON ENERGY NO: 1 LIMITED Storage (Duration 1.5h)
114.0 MW
Active - 2027-28 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
  • • An 87.500 MW Battery Storage Site Component.
  • • An 87.500 MW New Build Battery Storage Site Component
  • • An 87.500 MW New Build Battery Storage Site Component.
KILMARNOCK FLEXPOWER LTD Storage (Duration 1.5h)
55.2 MW
Active - 2028-29 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Plutus Energy LTD Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Craigie, South Ayrshire, Scotland, KA1 5JT (2 components)

A 175MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD Storage (Duration 1.5h)
40.3 MW
Active - 2027-28 (T-4)
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
  • • A 110.000 MW / 165.000 MWh battery energy storage system
  • • A 120.000 MW / 180.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
31.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
  • • New Build 99.9 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
KEADBY GENERATION LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
  • • 25MW Lithium-ion Energy Storage System
  • • 99.9MW Lithium-ion Energy Storage System
WALPOLE GREEN LIMITED Storage (Duration 1.5h)
28.8 MW
Active - 2027-28 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 components)

New Build Battery Energy Storage System

SHEAF ENERGY LIMITED Storage (Duration 1.5h)
27.4 MW
Active - 2028-29 (T-4)
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

WALPOLE GREEN LIMITED Storage (Duration 1.5h)
27.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
24.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.9MW Battery Energy Storage system
HARMONY HB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

WARLEY GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

ROARING HILL ENERGY STORAGE LTD Storage (Duration 2h) Storage (Duration 1.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
  • • A Lithium Ion Energy Storage System (2)
  • • A 49.9 Energy Storage System
HEIT HP LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.7 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

SWANGATE ENERGY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
21.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-1)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

SAMBAR POWER LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
  • • 49.5 MW Battery Energy Storage facility (3)
  • • 48 MW Battery Energy Storage facility
HARMONY CF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Clay Tye Road, Upminister, RM14 3PL (7 components)
  • • 49.5MW Battery Energy Storage facility connected to 132kv network (4)
  • • 48MW Battery Energy Storage facility connected to 132kv network
HARMONY CTF 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
  • • 49.5MW Battery Energy Storage facility (2)
  • • 48MW Battery Energy Storage facility
  • • 49.9MW Battery Energy Storage facility
HARMONY (PW) 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 1 more)
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

SUNDON GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
  • • A New Build Distribution Connected Battery Energy Storage System.
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE POWER PROJECTS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
17.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

MELKSHAM CALNE GREEN LIMITED Storage (Duration 9h) Storage (Duration 1.5h)
16.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Welkin Road, Bredbury, SK6 2BH (6 components)
  • • A gas fuelled generating station. (2)
  • • Battery Energy Storage System (2)
AVE 002 LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2023-24 (T-4) (and 1 more)
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 6 LTD Storage (Duration 2h) Storage (Duration 1.5h)
16.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

BRAMLEY SOLAR LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

ENSO GREEN HOLDINGS LIMITED Storage (Duration 1.5h)
15.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
  • • Energy Storage Site
  • • New Build 33 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HEIT WG LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
14.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

ECOSTOR 1 IMMINGHAM LTD Storage (Duration 1.5h)
14.2 MW
Active - 2026-27 (T-4)
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site (2)

ROTHIENORMAN FLEXPOWER LTD Storage (Duration 1.5h)
13.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Rusholme Grange, Drax, YO8 8PW (4 components)
  • • New build 35MW Battery Energy Storage System (2)
  • • Lithium-ion Battery Energy Storage System
HARMONY RH LTD Storage (Duration 2h) Storage (Duration 1.5h)
13.0 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
  • • A 46.000 MW / 69.00 MWh battery energy storage system
  • • A 47.500 MW / 71.250 MWh battery energy storage system
FLEET GREEN LIMITED Storage (Duration 1.5h)
12.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
  • • A Distribution Connected Battery Energy Storage System
  • • The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
BALANCE ENERGY 19 LTD Storage (Duration 2h) Storage (Duration 1.5h)
9.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Showing locations 1 - 50 of 106