Storage (Duration 5h)

12 unique locations 17 components 0 companies Page 1 of 1
Map View
Land to Far Souracre, SK15 3DA (2 components)

Lithium ion battery storage plant

Zenobe Stalybridge Limited Storage (Duration 5h)
31.4 MW
Active - 2028-29 (T-4)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant at Kirkby substation.
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)

A Battery Energy Storage System. (3)

HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
  • • 40MW battery storage located near to the Coalburn North 400kV substation.
  • • 50MW battery storage located near Coalburn North 400kV substation.
  • • 50MW battery storage located near to the Coalburn North 400kV substation.
ZENOBE COALBURN LIMITED Storage (Duration 4h) Storage (Duration 5h)
72.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (3)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Showing locations 1 - 12 of 12