132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant at Kirkby substation.
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)