Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

143 unique locations (576 components) - Page 1 of 6

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Willingham-by-Stow Farm, Marton Road, Stow, Lincoln, Lincolnshire, DN21 5BH (1 component)

Total Connection capacity of 400MW for Energy Storage. The component will be LFP BESS.

Active • 2029-30
133.64 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified PE11
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK42
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 DL14
Active • 2028-29 (T-4)
31.34 MW
Verge off Fingle Drive, Nr Grafton Street, Stonebridge, MK13 0DX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2026-27
0.11 MW
University Farm, Hailey, Witney, OX29 9UH (1 component)

Battery storage system

Active • 2029-30
1.67 MW
Unity Farm, Brampton, CA8 1QZ (2 components)

Diesel powered generation aggregating to 6MW output at Brampton in Cumbria. Output is net of auxiliary load.

Storage (Duration 4h) Prime Energy Limited Existing Generating CMU Brampton6MW CA8
Active • 2029-30 (T-4), 2017-18 (T-1)
1.32 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.26 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 component)

New Build Battery Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR-Treowen Not Prequalified NP11
Active • 2028-29 (T-4)
5.22 MW
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Tulliallan, Kincardine-On-Forth, Fife, FK10 4DT (5 components)

The CMU Component is a New Build Generating battery storage site.

Active • 2029-30
60.23 MW
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE30 Limited New Build Generating CMU Sundon30 Not Prequalified LU5
Active • 2027-28 (T-4)
92.03 MW
21.94 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Tillingdown Tillingdown 2 CR3
Active • 2028-29 (T-4)
7.52 MW
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (3 components) Geocoding Needed

BESS project to be installed within a future Greener Grid Park.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
104.10 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (15 components)
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Storage (Duration 2h) Storage (Duration 4h) THORPE MARSH GREEN ENERGY HUB LIMITED Thorpe Marsh BESS 1 Thorpe Marsh BESS 1 (2024) +13 more DN6
Active • 2028-29 (T-4), 2027-28 (T-4)
799.82 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

Storage (Duration 4h) BALWEN LIMITED STATKRAFT UK LTD New Build Generating CMU THOR-2 YO42
Active • 2028-29 (T-4), 2025-26 (T-1)
88.23 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CM7
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified CO4
Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Station Rd, Clowne, Chesterfield S43 4AB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Loading map...
Showing 25 locations