Storage (Duration 2h)

632 unique locations (1951 components) - Page 1 of 26

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Yeowood Farm, Iwood Lane, North Somerset, BS40 5NU (1 component)

A 2-hour duration containerised battery

Active • 2029-30
9.87 MW
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (4 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.14 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Withy Place Not Prequalified RG7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.46 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Storage (Duration 2h) HARMONY BH LIMITED New Build Generating CMU Bramham BESS Not Prequalified LS24
Active • 2027-28 (T-4)
4.31 MW
15.63 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Storage (Duration 2h) P3P ENERGY MANAGEMENT LIMITED New Build Generating CMU Widow Hill BESS Not Prequalified BB10
Active • 2027-28 (T-4)
10.77 MW
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham East Storage Melksham East Storage 010 +4 more SN12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Whitehill BESS, Land at Whitehill Estate and Edinbarnet Estate, Cochno Road, Clydebank, G81 5QS (4 components)

Front of meter BESS plant. The Connection Capacity stated is lower than the BESS capacity and the connection agreement - this is to allow for degradation of the battery over …

Active • 2029-30
73.63 MW
Whitburn Road, East Whitburn, West Lothian, Scotland, EH48 2XJ, United Kingdom (2 components)

Battery energy storage system 2hr duration with the associated infrastructure to allow for export to the grid network. The MEC/TEC under the connection agreement is stated as 200MW, this CMU …

Active • 2029-30
30.33 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2026-27 (T-4)
8.03 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph Not Prequalified PL12
Active • 2026-27 (T-4)
8.98 MW
West Nash Road, Nash, Newport, NP18 2BZ (3 components)
• A new build 115MW/230MWh 2 hour Battery Energy Storage System to be connected to the National Grid Transmission Network at 132kV located at the Uskmouth substation
• A new build 115MW/230MWh battery energy storage system connected to the National Grid Transmission network at 132kV, located at Uskmouth
• A new build 119.9MW/239.8MWh 2 hour Battery Energy Storage System to be connected to the National Grid Trasnmission Network at 132kV located at the Uskmouth substation.
Active • 2029-30, 2026-27
66.29 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (2 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) LEEMING SOLAR FARM LIMITED New Build Generating CMU Leeming Solar Farm BESS DL7
Active • 2028-29 (T-4), 2026-27 (T-1)
8.67 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Storage (Duration 2h) FVS WESTFIELD ROAD LTD New Build Generating CMU WESTFIELD ROAD BESS Not Prequalified WF3
Active • 2028-29 (T-4)
10.45 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Welwyn Power Not Prequalified AL7
Active • 2026-27 (T-4)
1.18 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-4) ...
25.00 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
18.68 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA23
Active • 2027-28 (T-4)
1.64 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 DL14
Active • 2028-29 (T-4)
31.34 MW
Loading map...
Showing 25 locations