Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2.5h)

145 unique locations 150 components 0 companies Page 1 of 3
Map View
Land East and South East of Dunton Hall Kingsbury Road Lea Marston North Warwickshire B76 0DH (1 components)

349.900MW Greenfield new build battery energy storage site

WELBAR ENERGY STORAGE LIMITED Storage (Duration 2.5h)
103.5 MW
Active - 2026-27 (T-4)
Minchens Lane Bramley Tadley RG26 5BJ (4 components)
  • • 99.000MW Battery Energy Storage site (2)
  • • New Build Battery Energy Storage site
BRAMLEY BATTERY STORAGE LIMITED Storage (Duration 3h) Storage (Duration 2.5h)
87.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
PULSE CLEAN ENERGY SPV WATT LIMITED Storage (Duration 2h) Storage (Duration 2.5h)
23.4 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2.5 Hour Battery Storage Plant.
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF (2 components)

A 28MW new build of battery storage unit. (2)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage (Duration 2.5h)
16.8 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2.5 hour battery storage system.
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (7 components)

Battery storage plant (3)

COUPAR LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
6.9 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

ALKANE ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h)
1.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Menear Road, Treverbyn, Trethurgy, Cornwall, PL25 3JT (1 components)

Battery Energy Storage System situated on a co-location site (BESS and PV) in Cornwall, England

MENEAR HYBRID LIMITED Storage (Duration 2.5h)
1.0 MW
Active - 2028-29 (T-4)
Land at Unity Farm, Brampton CA8 1QZ (1 components)

CMU component consisting of multiple battery cells for electricity storage @11kV and the supply of electricity to the 11kV network

URBAN RESERVE STORAGE LIMITED Storage (Duration 2.5h)
0.8 MW
Active - 2028-29 (T-4)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Station Rd, Clowne, Chesterfield S43 4AB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land On The West Side Of Greenacres, Roundswell, Barnstaple EX31 3YB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Verge lying to the South of Platt industrial estate, Kent, TN15 8JL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Sewage Treatment Works, Lawford Lane, Writtle CM1 3EW (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Castle Sports Complex, Albion Street, PE11 2AJ (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

ENERSYST LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Verge off Fingle Drive, Nr Grafton Street, Stonebridge, MK13 0AY (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Verge at Soskin Drive Car Park, Stantonbury Fields, MK14 6DT (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
South Camberley Adult Learning Centre, France Hill Drive, Camberley, GU15 3QA (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land at Eastcotts Road, Bedford, MK42 0JU (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land off Dukes Drive, Nr Princes Way Junction, Bletchley, MK2 2UP (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land on the South Side of Blackhorse Lane, Exeter, EX5 2FS (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land at Woodhatch Place, 11 Cockshot Hill, Reigate, RH2 8EF (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
County Hall, Topsham Road, Exeter EX2 4QD (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land On The West Side Of Old Teignmouth Road, Dawlish, EX7 0RT (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
The Site Of And Unit 11 Anson Close, Pyson'S Road Industrial Estate, Broadstairs, CT10 2YC (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Verge at the end of Fingle Drive, Stonebridge, MK13 0DN (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Land at Marine Way, Exmouth EX8 1RT (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4)
Showing locations 1 - 50 of 145