-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A Battery Energy Storage System
79.8 MW
Active -
2026-27 (T-4)
-
• Gas reciprocating engines as the generating unit.
(2)
-
• Battery Storage Station
-
• Open cycle gas turbine as the generating unit.
68.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
A Battery Energy Storage System
53.2 MW
Active -
2026-27 (T-4)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Battery Energy Storage Site
(2)
28.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
-
• New build two-hour duration battery storage
(2)
-
• New build one-hour duration storage
26.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 Hour Battery Storage Plant.
-
• ... and 1 more unique descriptions
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
Battery Storage Plant
(4)
20.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
CMU comprising of battery storage and associated plant
(7)
17.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 hour battery storage system.
-
• ... and 1 more unique descriptions
16.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• A gas fuelled generating station.
(2)
-
• Battery Energy Storage System
(2)
16.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2023-24 (T-4)
(and 1 more)
-
• 2 hr duration Battery Energy Storage System located in England
-
• Energy Storage Facility
14.6 MW
Active -
2028-29 (T-4),
2026-27 (T-4)
-
• 35.000MW battery energy storage system
-
• 35.000MW battery energy storage system.
-
• 49.990 MW battery energy storage system at Richborough Energy Park
-
• ... and 2 more unique descriptions
14.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
60MW / 60MWh BESS
14.2 MW
Active -
2026-27 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
14.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
-
• 50MW/50MWh one hour battery
(3)
-
• 50MW/50MWh one hour battery storage
12.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(6)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
-
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(2)
12.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
99.4MW / 99.4MWh BESS
11.7 MW
Active -
2026-27 (T-4)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
30MW/30MWh one hour battery
(3)
11.7 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
10.8 MW
Active -
2027-28 (T-4),
2025-26 (T-4)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• 49MW Lithium-ion Energy Storage System
(2)
-
• 49.9MW Lithium-ion Energy Storage System
9.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …
(4)
9.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
49.9MW Lithium-ion Energy Storage System
(4)
8.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
1 x 75MW Lithium-ion battery with duration of 1 hour
8.9 MW
Active -
2026-27 (T-4)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
8.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and …
(3)
-
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
(2)
8.3 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 2 more)
-
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
(3)
-
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
-
• BATTERY ENERGY STORAGE SYSTEM
8.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
-
• CMU ID 22GER1, a new build battery storage CMU
-
• CMU ID 22GER4, a new build battery storage CMU
-
• CMU ID 23GER1, a new build battery storage CMU
-
• ... and 1 more unique descriptions
7.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• Existing 25 MW storage site using Lithium Ion Batteries
(3)
-
• 25 MW storage site using Lithium Ion Batteries
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A 13MW New Build Battery Storage site
-
• A 6MW New Build CHP site
-
• A New Build Battery Storage site
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-4)
electricity storage site comprising brand new batteries, inverters and associated connection plant
(2)
7.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
60MW/60MWh BESS
7.1 MW
Active -
2026-27 (T-4)
-
• New Build CMU comprising of battery storage and associated plant
-
• New Build Generating CMU comprising of battery storage and associated plant.
7.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
Battery storage plant
(4)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
-
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
6.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• New build one-hour duration storage
-
• New build two-hour duration battery storage
6.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)