Storage (Duration 0.5h)
40 unique locations (141 components) - Page 1 of 2
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components) Geocoding Needed
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components) Geocoding Needed
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components) Geocoding Needed
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components) Geocoding Needed
A new power plant, with associated civil works, switchgear and electrical connection.
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components) Geocoding Needed
battery storage
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components) Geocoding Needed
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components) Geocoding Needed
A new power plant, with associated civil works, switchgear and electrical connection.
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (1 component) Geocoding Needed
battery storage with other generation
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components) Geocoding Needed
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components) Geocoding Needed
NEW BUILD BATTERY STORAGE STATION
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components) Geocoding Needed
A Prospective New Build Battery Storage facility
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)
A Prospective New Build Battery Storage facility (3)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components) Geocoding Needed
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)
Lower Road, Brentwood, CM13 1BZ (2 components) Geocoding Needed
Lower Road, Brentwood, CM13 1BZ (1 component)
Advanced battery energy storage system
Land to the West of Harker Grid Sub Station, Low Harker, Harker, Carlisle, CA6 4DQ (1 component) Geocoding Needed
New build transmission connected battery storage site
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (Nearest Postcode to grid reference: SG9 0JB) (2 components) Geocoding Needed
Battery Storage Plant
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (Nearest Postcode to grid reference: SG90JB) (2 components)
Battery Storage Plant (2)
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components) Geocoding Needed
Battery Storage Plant