Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Solar Photovoltaic

24 unique locations 41 components 0 companies Page 1 of 1
Map View
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant (5)

CONRAD (LARPORT) LIMITED Solar Photovoltaic
4.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (4 components)

Solar PV generation site (3)

ALKANE ENERGY CM LIMITED Solar Photovoltaic
1.0 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (4 components)

Solar PV generation site (3)

ALKANE ENERGY UK LIMITED Solar Photovoltaic
0.9 MW
Active - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (6 components)
  • • Solar PV generation site (2)
  • • Solar photovoltaic generating station (2)
  • • SolarPV generating station
ALKANE ENERGY UK LIMITED Solar Photovoltaic
0.4 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Colton Farm Lochead Dunfermline Fife KY10 (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
LAND AT NEW FARM ESTATE, OUSE MOOR ROAD, YORK, YO26 6HU (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire (1 components)

Solar PV Park with maximum export capacity of 49.9MW

FP LUX SCURF DYKE SOLAR LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Land to the West of Home Farm, Tingrith, Milton Keynes, Bedfordshire, MK17 9EW (1 components)

Solar photovoltaic generation scheme connected to the distribution network

P3P Partners LLP Solar Photovoltaic
Active - 2025-26 (T-4)
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 components)

Solar Voltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
New Parks Estate, Huby, York, North Yorkshire, YO61 1JD (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Newton Farm Newton South Queensferry West Lothian EH30 9SN (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
QUIDHAMPTON, POLEHAMPTON FARM, ASHE LANE, OVERTON, BASINGSTOKE, RG25 3BS (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Sutton on Forest Solar Plainville Lane, Wigginton, York, YO32 2RG (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
TOWNSEND FARM, POULSHOT, DEVIZES, SN10 1SD (1 components)

Solar photovoltaic generation scheme connected to the distribution network

ASE UK HOLDINGS LIMITED Solar Photovoltaic
Active - 2025-26 (T-4)
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
  • • Gas fired reciprocating engine(s) (2)
  • • Solar PV generation site
  • • The site comprises of gas reciprocating unit(s)
ALKANE ENERGY UK LIMITED Solar Photovoltaic Reciprocating engines
Inactive - 2025-26 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Coldham Estate Windfarm, Coldham, Cambridgeshire PE14 0LX (2 components)

A Solar PV site with a capacity of 9MW. (2)

SCOTTISHPOWER RENEWABLES (UK) LIMITED Solar Photovoltaic
Inactive - 2025-26 (T-4), 2022-23 (T-1)
Land at Fiddlers Green, Carland Cross Windfarm, St. Newlands East. Windfarm Postcode: TR8 5AY (2 components)

A Solar PV site consisting of 21,987 panels of 455W Solar PV Panels (2)

SCOTTISHPOWER RENEWABLES (UK) LIMITED Solar Photovoltaic
Inactive - 2025-26 (T-4), 2022-23 (T-1)
Showing locations 1 - 24 of 24